-
Published24/01/2025
-
Deadline12/02/2025
-
Today22/03/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Imst substation - delivery and commissioning of 123 kV disconnector and earthing switch Text automatically translated in your browsing language Automatically translated
A service contract is concluded with a company for the delivery of a total of 68 123 kV isolating and earthing switches as well as final assembly and commissioning (remuneration according to actual expenditure) at UW Imst. The total requirement consists of:-) 33 pieces 123kV pantograph disconnector, 3-pole, at least 2000A, 40kAx1s-) 6 pieces 123kV pantograph disconnector, 3-pole, at least 3150A, 40kAx1s-) 3 pieces 123kV pantograph disconnector, 3-pole, at least 2000A, 40kAx1s, + 1 grounding switch-) 7 pieces 123kV two-pole, at least 2000A, at least 2000A, 40kAx1s, + 1 grounding switch-) 7 pieces 123kV two-column disconnector, 1-pole, at least 2000A, 40kAx1s-) 12 pieces 123kV single-column grounding switch, 3-pole, at least 40kAx1sOptional are also to offer 75 commutation contact systems. Text automatically translated in your browsing language Automatically translated
https://tiwag.vemap.com
https://tiwag.vemap.com
31212100 - Overhead circuit breakers
31214000 - Switchgear CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.