Execution of construction and assembly works for the task: "Construction of Tomaszkowo GPZ station" Text automatically translated in your browsing language Automatically translated
1. The subject of the contract is the execution of construction and assembly works for the task âConstruction of the Tomaszkowo GPZ stationâ. The scope of construction of the Tomaszkowo GPZ station includes, among others: construction of a station building with construction and installation equipment, i.e. cabinets for own needs, technical devices in the form of a 15kV switchgear and batteries, water supply systems, sanitary sewerage, ventilation, air conditioning, heating, plug-in sockets, electric, basic lighting, emergency lighting, technical protection of the facility, ICT. Construction of one lattice pole in the existing 110kV line. Construction of grounding teams. Construction of 110kV overhead switchgear in traditional AIS technology with delivery and installation of two 25 MVA WN/SN transformers and neutral point grounders. Technical infrastructure, i.e. construction of internal roads, construction of fences, construction of external water supply and sanitary sewage system, construction of water supply connection, construction of station drainage system, construction of external lighting, construction of access road to the station, construction of lightning protection and grounding system of the station, construction of technical protection system of the station. Construction of two WN/SN transformer stations. N.B.: The contracting authority, taking into account that the completion of the contract will take place after 01.01.2026, does not allow to offer the switchgear the primary separation of the SC with the use of an insulating medium in the form of fluorinated greenhouse gases (including SF6), because on the date of acceptance of the construction work it will not be able to introduce such a device for use in accordance with Article 13 sec. Regulation (EU) 2024/573 of the European Parliament and of the Council of 7 February 2024 on fluorinated greenhouse gases, amending Directive (EU) 2019/1937 and repealing Regulation (EU) No 517/2014 Regulation - EU - 2024/573 - EN - EUR-Lex 2. A detailed description of the subject of the contract is included in the design documentation and STWiORB constituting Annex No 15 to the FTZ. The contracting authority requires that the subject of the contract be carried out in accordance with the guidelines indicated in these documents (Annex No 16 to the FTZ) and the instructions and standards annexed to the FTZ (Annex No 17 to the FTZ) and the draft provisions of the contract (Annex No 13 to the FTZ). Text automatically translated in your browsing language Automatically translated
https://zakupy.energa-operator.pl/app/demand/notice/public/current/list?USER_MENU_HOVER=currentNoticeList
https://zakupy.energa-operator.pl/app/demand/notice/public/current/list?USER_MENU_HOVER=currentNoticeList
71352000 - Subsurface surveying services
45317000 - Other electrical installation work
71300000 - Engineering services
71354000 - Map-making services
45311000 - Electrical wiring and fitting work
71350000 - Engineering-related scientific and technical services
45223000 - Structures construction work
45111000 - Demolition, site preparation and clearance work
71520000 - Construction supervision services
51000000 - Installation services (except software)
71000000 - Architectural, construction, engineering and inspection services
45112000 - Excavating and earthmoving work
45220000 - Engineering works and construction works
45440000 - Painting and glazing work
71340000 - Integrated engineering services
51900000 - Installation services of guidance and control systems
71510000 - Site-investigation services
45100000 - Site preparation work
45232000 - Ancillary works for pipelines and cables
45314000 - Installation of telecommunications equipment
45400000 - Building completion work
71330000 - Miscellaneous engineering services
45450000 - Other building completion work
45310000 - Electrical installation work
45442000 - Application work of protective coatings
71500000 - Construction-related services
51110000 - Installation services of electrical equipment
45110000 - Building demolition and wrecking work and earthmoving work
45222000 - Construction work for engineering works except bridges, tunnels, shafts and subways
71540000 - Construction management services
45520000 - Hire of earthmoving equipment with operator
51100000 - Installation services of electrical and mechanical equipment
45300000 - Building installation work
45510000 - Hire of cranes with operator
45233000 - Construction, foundation and surface works for highways, roads
45231000 - Construction work for pipelines, communication and power lines CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.