-
Awarded10/10/2014
-
Today09/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Poland-Olkusz: Sewage-treatment plant construction work
Additional contract consisting of:
A. the execution of the works necessary for the proper operation of the pumping station within the out-of-pool tanks – Facility No.
1 – Main pumping station;
B. carrying out the works necessary for the proper operation of the pre-denitrification and dephosphatisation chamber for construction
reservoir – facility No 5/1 – Biological waste water treatment stock;
C. the execution of the works necessary to achieve the intended technological effect of modernisation
secondary settlers – plant Nos 6/1, 6/2 – secondary settlers;
D. execution of works necessary for the comprehensive modernisation of the sludge fermentation node – plant Nos 11/1, 11/2
— Secondary fermentation chambers;
for the basic contract – Contract W7 Rebuilding of the Ścieków treatment plant in Olkuszu for the project entitled ‘Organisation of waste water management in the Biała Przemszy catchment area in the following municipalities: Olkusz, Bukowno, Bolesław and Klucze – Phase I’, which is implemented in accordance with contract No ZP/2/2013/W7 signed on 16.5.2013,
drawn up on the basis of the Contract Terms for Construction for civil engineering works designed by the Contracting Authority’ – translation of the 1st edition of 1999 and the 4th edition of English-Polish, unchanged, 2008 (so-called: ‘red’ FIDIC), hereinafter referred to as FIDIC and in accordance with the provisions of the Construction Law Act of 7.7.1994 (consolidated text: Journal of Laws 2010, No 243, item 1623 as amended).
Ad.A. The scope of the works includes:
(a) construction of new coatings of walls, bottoms, ceilings of receptacles with the technology proposed by the Contractor and used on other technological sites – plant No 4 – pre-settler.
Ad.B. The scope of the works includes:
(a) demolition of the outer wall of the concrete channel, in the portion pre-looked to leave;
(b) drilling and pasting of steel anchors to strengthen the connection of the plate to the new wall;
(C) preparation of the surface of the existing board on the connection – removal of loose fragments, application of the varietal layer;
(D) position of the bentonite strap or injection hose to seal the joint;
(e) reinforcing the wall with 8 mm wire rods;
(F) walling;
(g) corrosive and sandwiched surfaces of walls and exposed concrete;
(H) anti-corrosion armour protection and reprofiling of concrete elements, with full recovery of the coating.
Ad.C. The scope of the works includes:
(a) Renovation of the concrete structure of settlers 6.1 and 6.2;
(b) the replacement of steel components of the central chamber;
(C) replacement of drain strips with surface and lower deflectors;
(D) replacement of the scraper with the central bearing;
(e) connection of equipment to the ACP andA system.
Ad.D. The scope of the works includes:
(a) the consequences of weak and ‘deaf’ layers of casing;
(b) sanding of the entire inner surface, including the armour exposed;
(C) anti-corrosion armour protection and opening of the sheath, by reprofiling with pcc. mortars;
(D) insulation of the entire inner surface with a mineral coating;
(e) replacement of internal tubing and replacement or anti-corrosion protection of an interior mounted guard.
Postal address: ul. Grzybowska 87
Town: Warszawa
Postal code: 00-844
Country: POL
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.