Published10/06/2025
-
Deadline08/07/2025
-
Opening of tenders09/07/2025
-
Today19/07/2025
Utilities
- indicates text translated automatically in your browsing language
Property planning Buildings - Wastewater treatment plant Medium couple Extension Company building Text automatically translated in your browsing language Automatically translated
The existing company building of Stadtwerke Friedberg, wastewater treatment plant Mittel Paar dates back to 1995. Meanwhile, the number of employees has changed, as have the requirements for sanitary and changing areas. To remedy the situation, a feasibility study was commissioned in February 2024, followed by a pre-planning exercise. Due to the need for space for the sanitary facilities and the necessary clear separation of black and white areas, a separate building was planned for the sanitary facilities. The extension is to be connected to the existing building on the north side via a connecting structure. Taking into account the existing trees and the border situation, it is planned to place the extension to the existing company building as a single-storey, compact building with dimensions of approximately 15 × 12 m. In the existing laboratory, a connecting corridor is separated and the laboratory is expanded in the area of the currently existing changing rooms on the ground floor. Applying the technical rules for biological agents, the technical rules for workplaces and the relevant rules for black and white - areas results in a space requirement of about 105 m2 for approximately six to ten male and one to five female employees. Since a mechanical ventilation system ensures the air exchange, the building is provided without windows. Daylight is supplied by skylights. On the upper floor of the existing company building, a new office with almost 20 m2 can be obtained from the previous sanitary and changing area. The lighting of this office is done via roof windows, the ventilation via a mechanical ventilation system. To improve the working and exposure situation, four additional roof windows are proposed for the existing office with almost 40 m2. Various materials were examined for the construction. A plastered masonry construction is proposed as a low-maintenance construction, alternatively a facade cladding. The new social building is heated with underfloor heating. Ventilation according to the Workplace Directive is ensured by a central ventilation system with heat recovery. As a target, the heat energy for heating and hot water for both the new sanitary cultivation and for the existing building will no longer be via gas, but via a heat pump. The power generation for the heat pumps can be covered by the existing outdoor photovoltaic system. The wastewater treatment plant is always staffed underground on working days. Text automatically translated in your browsing language Automatically translated
https://www.staatsanzeiger-eservices.de/aJs/EFormsBekVuUrl?z_param=312833
https://www.staatsanzeiger-eservices.de/aJs/EFormsBekVuUrl?z_param=312833
Type: quality
Description: Qualität des fachlichen Angebotes
Weight (percentage, exact): 70
Criterion:
Type: price
Description: Gesamthonorar
Weight (percentage, exact): 30
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.