-
Published08/10/2025
-
Deadline10/11/2025
-
Today15/11/2025
Utilities
- indicates text translated automatically in your browsing language
Karl-Rehbein-Schule, Dep. II - Demolition of the House of Crafts and Extension Construction - Carcass Work Text automatically translated in your browsing language Automatically translated
Structural works for the construction of the extension Karl-Rehbein-Schule, Dep. II General: The Karl Rehbein School (KRS) has been using rooms of the Pestalozzi School as a branch for several years. In order to create space for the future expansion of the primary school, a new building is to be built for the upper school of the Karl Rehbein School on a partial area of the Fronhof area. The "House of Crafts" currently used as an office building will be completely dismantled in the course of the planned expansion of the Karl Rehbein School in order to realize the new building. Building class: Building class 5 - Special construction classified GFA: approx. 3,400 m2; BRI: approx. 13.8000 m3 component A: KG / EG / OG /DG (steep roof) Component B: Ground floor / upper floor / ground floor (flat roof) Construction: The construction is based on a conventional solid construction. The building is partially basemented and has four usable levels - basement, ground floor, upper floor and attic/seasonal floor. The walls are constructed as masonry or reinforced concrete constructions. The ceilings above the UG, EG, OG and DG are made of reinforced concrete, with the exception of the steep roof in component A. The steep roof of component A is designed as a carpenter's wooden construction. The facade of component A is intended as a coloured sandstone façade on Schlossplatz and Münzgasse. The facades of component B are designed as plaster facades. The gable roof of component A is intended as a standing seam metal roof. The flat roof surfaces of component B are greened. Photovoltaic areas are installed exclusively on the roof above the recessed floor. To the Fronhof there is a roof terrace used for school purposes. Partial areas of the plaster facade in the Fronhof receive vine aids and are greened. Specifications / Type and scope of the subject matter of the contract: The subject-matter of the tendered service is: - Structural works for the construction of the new building of the Karl-Rehbein-Schule, Dep. II; - security and construction site installation work, construction site construction / construction site equipment for construction purposes; - earthworks, excavation excavation pit / foundation substructure incl. ground line and lightning protection works; - Reinforced concrete work, manufacture of truss foundations, walls and ceilings (partially WU) Supply and installation of truss prefabricated parts (staircases); - masonry work, load-bearing and non-load-bearing external and internal walls; - waterproofing and insulation work; - Steel construction works. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E98993989
https://www.subreport.de/E98993989
Type: price
Description:
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.