-
Published07/05/2025
-
Deadline06/06/2025
-
Awarded19/11/2025
-
Today20/05/2026
Utilities
- indicates text translated automatically in your browsing language
Demolition and new construction of the Dientzenhofer-Gymnasium in Bamberg - Structural design services in accordance with §§ 49 et seq. HOAI
The special purpose association Gymnasien Stadt und Landkreis Bamberg, represented by the city of Bamberg, intends to replace the Dientzenhofer-Gymnasium including the outdoor facilities. The existing school with three sports halls and caretaker's apartment is to be dismantled during operation in construction phases and replaced by a new building. The aim of the measure should be to carry out demolition and new construction phases during ongoing school operation. The outsourcing of lessons (e.g. in containers) should be avoided as far as possible. The Dientzenhofer-Gymnasium is a STEM school with 1,500 students in the future and focuses on mathematical, scientific and technical topics. It fulfils the tasks assigned by the Ministry of Culture as a school of inclusion, a sports school and a seminary school for the training of new educators. In order to accommodate the growing number of students in a 6-course high school with 54 classrooms, a building with a bandwidth of 8,197 m2 to a maximum of 9,766 m2 of main usable area is required in accordance with funding conditions. 1,728 m2 of main floor space will be used for the three-field sports hall. As further areas, specialist rooms, library, break rooms, staff rooms (pedagogy and administration), kitchen and dining area, all-day area, house caretaker, adjoining rooms etc. are to be included in the further planning. The pedagogical concept for the new building of the Dientzenhofer-Gymnasium provides in continuation of the previous pedagogical work of the school a cluster formation or the learning house concept for the promotion of cooperative and individual learning. The Dientzenhofer-Gymnasium is supplied with district heating from the city of Bamberg. Furthermore, there is a mixed water system in which rainwater and wastewater are discharged in a canal. On the property there are several water and power supply connections on the site so that an excellent technical infrastructure for the construction project is guaranteed. For more detailed information on the technical infrastructure for gas, water, wastewater and district heating, please refer to the enclosed procurement documents. The milestones for the implementation of the project include: - Start of service: August 2025 // - Start of construction: Mid-2027 // - Completion: Mid-2032 // The total cost of the project (KG 200-700) is estimated at €83.9 million gross, and is divided into the following distribution of the KG: - KG 200 €40,000 // - KG 300 €44,458,059 // - KG 400 €14,819,353 // - KG 500 €4,918,958 // - KG 600 €2,900,000 // - KG 700 €16,784,092 // It is intended to commission the following services with this invitation to tender: Services of structural design according to §§ 49 et seq. HOAI The services are commissioned in stages. First, in the 1. Commissioning stage commissioned the performance phase 1-2 in accordance with § 49 HOAI. The power phases 3-6 are retrieved step by step. There is no legal claim to total assignment.
https://plattform.aumass.de/Veroeffentlichung/av24fd09-eu
https://plattform.aumass.de/Veroeffentlichung/av24fd09-eu
Postal address:
Town: Chemnitz
Postal code: 09112
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.