Planning services for the planned construction of 110 kV cable lines between the substations Nord, Mole and Niehler Hafen - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Planning services for the planned construction of 110 kV cable lines between the substations Nord, Mole and Niehler Hafen

  • Published
    11/08/2025
  • Deadline
    18/09/2025
  • Today
    15/09/2026
Status
Submission closed
Type of contract
Services
Subject for Renewal
No
Buyer
RheinEnergie AG -L-
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEA23 Köln, Kreisfreie Stadt
Business sector (Main CPV)
71323100 Electrical power systems design services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

RheinNetz GmbH is planning the construction of new 110 kV cable routes to connect a large heat pump in the Cologne city area. The aim is to ensure a high-performance power supply in the high-voltage area by connecting the substations (UW) Nord, UW Mole and the new UW Niehler Hafen. The following cable systems are provided for the realization of the network structure: Section Number of cable systems Length UW Niehler Hafen – UW Mole 2 approx. 0.55 km UW Niehler Hafen – UW Nord 2 approx. 2.60 km UW Mole – UW Nord 1 approx. 2.10 km The routing is carried out taking into account defined connection points in the respective substations (offer phase Annexes 5.1 to 5.4). It is to be searched for georedundant single paths for all track sections. In order to comply with the redundant supply, the individual cable systems are preferably laid in spatially separated streets, but in the case of a borderline, at least on opposite sections of a common street. The cable laying is mainly made in open trench construction. Only at neuralgic points (e.g. railway tracks, crossings, water bodies, bridges, etc.) is the production carried out in underground construction.

Submission Method
Electronic via:
https://www.subreport.de/E97621777
Tenders may be submitted
Electronic submission: required
https://www.subreport.de/E97621777
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
Not available
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.