Photovoltaics in the village Straškov-Vodochody - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Photovoltaics in the village Straškov-Vodochody Text automatically translated in your browsing language Automatically translated

  • Published
    05/06/2025
  • Deadline
    07/07/2025
  • Opening of tenders
    07/07/2025
  • Today
    18/07/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
Obec Straškov-Vodochody
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: CZ042 Ústecký kraj
Business sector (Main CPV)
09331000 Solar panels
Total estimated contract value (excluding VAT)
6,000,000.00 CZK
Total final contract value (excluding VAT)
Not available
Tender reference number
1
Description

On the roofs of the buildings will be used photovoltaic (PV) panels of 600 Wp to ensure the minimum required power of the photovoltaic power plant (PV) according to the specifications. One optimizer will be installed between each 2 panels. Optimizers ensure safe disconnection of panels when the PV system is switched off. The voltage between the two panels will not be greater than 120 V DC. The installation will include PV panels, optimizers, RDC and RAC switchboards, electricity meters and inverters for transforming DC electricity into AC electricity, while the power of the inverters will meet the next higher power series according to the power of PV panels on individual roofs. The inverters and electricity meters used will be designed to provide a common communication that will end up in a local LAN with an internet connection. The inverter shall enable a fully valuable insular mode (OFF GRID) as well as the supply of electricity to the distribution network. Island mode means the full power supply of an object from a PV system with a disconnected distribution network. Furthermore, the inverter must comply with all relevant standards and directives under EU legislation. In addition, it must be compatible with voltage systems of type TN-C and TN-S. The overview of the state of production and consumption of the generated electricity will be determined according to the software components supplied by the inverter manufacturer. This is the current graphical overview of the generated and consumed electricity and the current power of the photovoltaic power plant. The overview will be accessible via the Internet network. It will be possible to control the PV plant from the graphical interface and to determine the priorities of electricity flow control. Each inverter will be connected to a local LAN with the possibility of connecting to the Internet. There is always a connection of the PV plant to the router. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.vhodne-uverejneni.cz/zakazka/fotovoltaika-v-obci-straskov-vodochody
Tenders may be submitted
Electronic submission: required
https://www.vhodne-uverejneni.cz/zakazka/fotovoltaika-v-obci-straskov-vodochody
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
07/07/2025 10:00
Place of performance
Award method
Základním a jediným hodnotícím kritériem pro zadání veřejné zakázky je nejnižší nabídková cena bez DPH.
Estimated value
6,000,000.00 CZK
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.