Supply and installation of an air blower for the Wastewater Treatment Plant in Tarnów - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Supply and installation of an air blower for the Wastewater Treatment Plant in Tarnów Text automatically translated in your browsing language Automatically translated

  • Published
    25/04/2025
  • Today
    28/04/2025
  • Deadline
    07/05/2025
  • Opening of tenders
    07/05/2025
Status
Published
Type of contract
Supplies
Subject for Renewal
No
Buyer
Tarnowskie Wodociągi Sp. z o.o.
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL217 Tarnowski
Business sector (Main CPV)
42123400 Air compressors
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
FENX.01.03-IW.01-0011/24-TW/05/2025
Description

1. The subject of the contract is the supply and installation of an air blower for the Tarnów Sewage Treatment Plant at ul. It's a clear 14. During the works related to the installation of the device, the continuity of work of the Sewage Treatment Plant should be maintained. The subject of the contract is the performance of a full range of works and accompanying activities related to the performance of the contract together with the connection of a new blower to the existing air intake, the execution of a pipeline from the suction side supplying air from the intake to the blower together with the throttle. Execution of a part of the Control and Measurement Equipment and Automation system (hereinafter: AKPiA) by incorporating the supplied blower into the plant's aeration control system; connection of the new blower with the existing Simatic S7-300 master controller; making the necessary changes to the master controller software (modification of the blower controller so that the new blower is the leading blower). Making the connection of the electric blower, including min.: - electrical wiring - approx. 50 m; - complete cabinet equipment n/n; All materials used must have certificates, approvals, certificates and comply with Polish Standards. The Contractor will deliver, install only new devices that are in current production. Equipment and solutions identified as a prototype, test series, workshop product or as a unit production shall not be used. The equipment and fittings shall come from a manufacturer providing maintenance and warranty services in accordance with the requirements described in the model contract. The Ordering Party reserves the right to request field tests before delivery and assembly in order to verify the correct operation of the proposed devices and equipment. As part of the subject of the contract, the Contractor is obliged to develop and provide as-built documentation and operating instructions in Polish together with training of employees in the use of the blower. 2. A detailed description of the subject-matter of the contract (hereinafter referred to as ‘OPZ’) is set out in Annex 8 to the SWZ. 3. The deadline for binding the offer is 90 days, i.e. until 04.08.2025. 4. Due to the specific nature of the subject of the contract, the Contracting Authority requires the Contractor to carry out an on-site inspection at the investment site in order to assess and check the possibility of delivery and assembly works and assess the existing condition. The Contracting Authority does not provide for the meeting of contractors within a specified period for a local visit, but declares full assistance and access to the construction site after prior arrangement of the date, before the expiry of the submission of tenders, with persons authorized on its side. The person authorized under the Contracting Authority's website to contact about the on-site visit is: Tomasz Komorowski , email: komorowski@tw.tarnow.pl It is allowed to submit an offer without making a local inspection. 5. 5.1.The Contracting Authority does not provide for the selection of the most advantageous offer with the possibility of conducting negotiations. 5.2.The Ordering Party does not provide for the submission of an offer in the form of electronic catalogues. 5.3 The Contracting Authority does not allow the submission of variant offers. 5.4. The contracting authority does not envisage the conclusion of a framework agreement. 5.5. The contracting authority does not provide for the award of contracts referred to in Art. 1 point 7 of the Public Procurement Act. 5.6. Clarifications and amendments to specification 5.6.1. The Contracting Authority shall require the Contractor, using the e-procurement platform, to request the Contracting Authority to clarify the content of the Specifications of the Terms and Conditions. 5.6.2. The Ordering Party is obliged to provide explanations immediately, but not later than 6 days before the deadline for submission of tenders - provided that the request for clarification of the content of the tender specifications was received by the Ordering Party not later than 14 days before the deadline for submission of tenders. 5.6.3 If the request for clarification of the content of the tender specifications was received after the deadline for submitting the application referred to in point. 19.7.2., the Ordering Party may provide explanations or leave it unrecognized. The extension of the time limit for the submission of tenders shall not affect the time limit for the submission of a request for clarification of the content of the CVS. 5.6.4. The content of the enquiries together with explanations (without disclosing the source of the enquiry), modifications to the SWZ, information on the extension of the deadline for submitting tenders, copies of appeals concerning the content of the contract notice or provisions of the SWZ The Ordering Party shall publish on the website indicated in paragraph 1 of the SWZ - on the e-procurement platform 6.6.5. In accordance with Art. 2 of the Public Procurement Act, the procedure is conducted in Polish. In the light of the above, requests for clarification of the content of the SWZ, documents, statements and other documents submitted in the proceedings should be submitted in Polish. 5.7. The Contracting Authority does not intend to convene a meeting of the Contractors. 5.8. The contracting authority shall require an on-site visit . 5.9. The contracting authority does not require the contractor to check the documents necessary for the performance of the contract available on the spot at the contracting authority. 5.10 The Contracting Authority does not provide for the selection of the most advantageous offer using an electronic auction. 5.11. The contracting authority provides for the cancellation of the procedure on the basis of Article 257 of the Public Procurement Act. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://ezamowienia.gov.pl/mp-client/tenders/ocds-148610-74ad3068-118d-4bec-a02f-e67b001adc08
Tenders may be submitted
Electronic submission: required
https://ezamowienia.gov.pl/mp-client/tenders/ocds-148610-74ad3068-118d-4bec-a02f-e67b001adc08
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
07/05/2025 11:00
Place of performance
Award method
Criterion:
Type: price
Description: cena 80% -szczegółowe uregulowania w Specyfikacji Warunków Zamówienia
Weight (percentage, exact):
Criterion:
Type: quality
Description: Okres gwarancji dla dmuchawy 20% - szczegółowe uregulowania w Specyfikacji Warunków Zamówienia
Weight (percentage, exact):
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.