Framework contract for the production, operation, maintenance, adaptation and dismantling of a construction power distribution network including temporary path and area lighting.
A new sustainable plant park for heat generation is to be built at the HKW Klingenberg site by 2030. For the supply of the associated various project works at the site, the construction and connection, the operation, the maintenance, the needs-based adaptation and the final dismantling of the electrical supply (medium- 6 kV and low-voltage systems 0.4 kV) for the required construction power grid as well as the construction and connection, the operation, the maintenance, the needs-based adaptation and the final dismantling of the temporary lighting are advertised. Content of services: - Plant and assembly planning in the scope of the respective call-off - Production of cable ducts / ditches, excavation pits, incl. necessary ground improvement and construction structures - Supply, laying and installation of cables (electric medium-voltage level (6 kV) and low-voltage level (0.4 kV)), fiber optic conductors, provision and connection of transformers and heavy-duty distributors, incl. the associated grounding and lightning protection measures as well as all tests and documentation - Cleaning and normative testing of the existing stations (transformers) for re-commissioning - Demand-oriented procurement, provision and connection of new transformer stations and 0.4 kV distributors incl. testing for IBS - Implementation of transformers and 0.4 kV distributors as part of the adaptation of the construction power network to requirements, incl. electrical connection - Delivery, erection and electrical connection of temporary lighting systems, incl. the associated grounding overvoltage and lightning protection measures as well as all testing and documentation: The interfaces to the construction power grid are defined by the cable terminations of the 6 kV feed-in lines at the cells of the switchgear in base point 3 (electrical feed-in 6 kV, starting point on the premises) and by the connection terminals of the NH output strips in the 0.4 kV heavy-duty distributors (SV, destination point). All the above activities are applicable within these interfaces.
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/ec8c97bb-9122-4f9e-8528-acbfaffc13cf
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/ec8c97bb-9122-4f9e-8528-acbfaffc13cf
45251100 - Construction work for power plant
45316100 - Installation of outdoor illumination equipment
45317300 - Electrical installation work of electrical distribution apparatus
45316110 - Installation of road lighting equipment
34928500 - Street-lighting equipment
34928510 - Street-lighting columns
45231400 - Construction work for electricity power lines
50532400 - Repair and maintenance services of electrical distribution equipment
34991000 - Field operating lights
31321000 - Electricity power lines
31300000 - Insulated wire and cable
31200000 - Electricity distribution and control apparatus
31320000 - Power distribution cables
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.