-
Published17/03/2025
-
Today18/04/2025
-
Deadline28/04/2025
-
Opening of tenders28/04/2025
Utilities
- indicates text translated automatically in your browsing language
Renovation of indoor swimming pool and sports hall, 54666 Irrel Text automatically translated in your browsing language Automatically translated
1 piece open filter as vacuum filter for a filtrate volume flow of 130 m3/h 250 m HD-PE pipes in butt welding process up to 280 x 15.9 3 pieces bath water pumps 1 piece flood water tank cantilevered made of PP plate material 1 piece sludge water tank cantilevered made of PP plate material 1 piece rinse waste water treatment plant treatment rinse waste water with ultrafiltration and reverse osmosis, return to the circuit 1 piece MSR technology 1 piece control tank for the control of bath water technology 1 piece calcium hypochlorite dosing station Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E14879127
https://www.subreport.de/E14879127
Type: price
Description: 100 %
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.