-
Published20/12/2024
-
Deadline20/01/2025
-
Opening of tenders20/01/2025
-
Today21/01/2025
Utilities
- indicates text translated automatically in your browsing language
Execution of additional works related to the investment objective “Modernization of Mihai Viteazul Boulevard in Zalău” - Stage I (Section 1) Text automatically translated in your browsing language Automatically translated
The contracting authority wishes to purchase the works contract for the execution of additional works related to the investment objective “Modernization of Mihai Viteazul Boulevard in Zalău” - Stage I (Section 1). The works covered by the procurement are additional works relating to the same investment objective and will be carried out on the site for ‘Modernisation of Mihai Viteazul Boulevard in Zalău,, – Stage I (Section 1), the site being handed over to the builder DRUM INSERV S.R.L. These additional works have arisen as a result of the need to ensure the technical conditions necessary for continuous and safe road traffic, in order to ensure an appropriate aesthetic appearance and to correlate road signs with the section studied in the project. According to the Construction Site Provision and the attached lists of quantities, the works proposed to be carried out under the contract are: 1.Current repairs regarding the circulatory paths through the execution of bituminous coverings of two layers (bond and wear). In order to achieve a good collaboration between the new layers and the existing asphalt layers, as well as to restore the transverse slopes of the street (necessary to ensure the conduction of rainwater to the existing drains), it is necessary to mill the existing clothing and reheat the asphalt mix in the initial thickness without additionally loading the existing structure and ensuring an appropriate transverse slope. Also, in order to prevent the occurrence of cracks and to increase the service life, it is necessary to lay an anti-crack geocomposite. 2. Complete replacement of worn and degraded curbs with new curbs, including the restoration of their foundation. 3. Lifting of drains and manholes with replacement of degraded elements. 4. Current repairs on equipment and constructions for traffic safety management by executing horizontal markings so as to be correlated with the solutions proposed in the project. In order to execute the additional works generated by the current repair works proposed on the two sections, respectively on the sector Km 0+290 - Km 0+320 and the end of the studied section (Km 0+660) - the intersection of Mihai Viteazul Boulevard with Tudor Vladimirescu Street and Simion Bămuțiu Street, the situation plans were drawn up (D.S. 01/01/PS/2/1; D.S. 01/01/PS/6/-) and plans with additional intervention area’. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.