-
Published30/05/2025
-
Today19/06/2025
-
Deadline09/07/2025
-
Opening of tenders10/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
‘Engineering (design, construction and supervision) for the execution of a site: Energy renovation of a multi-family residential building, 31 Bulgaria Blvd., Harmanli Text automatically translated in your browsing language Automatically translated
This public procurement is designed to improve the energy performance of the Multi-Family Residential Building, including to reduce energy poverty and vulnerable energy consumers in the municipality of Harmanli, heavily affected by the climate transition, connected to the Maritsa Basin and falling within the territorial scope of the Just Transition Fund. In order to achieve this, it is envisaged that the following will be implemented within the framework of this award: Preparation of an investment project in the ‘working project’ phase and implementation of author’s supervision during construction. The contractor's design team is obliged to exercise author's supervision during the construction of all parts of the project in accordance with Art. 162 of the Spatial Development Act. The designer under the relevant part must be present at the drawing up of all acts and protocols requiring the participation of a designer, mandatory according to the category of the construction according to the requirements of Ordinance No 3 of 2003 on the drawing up of acts and protocols during construction. Execution of the planned construction works according to the prepared project documentation. The warranty periods for the site are in accordance with Ordinance No 2 of 2003 on the commissioning of construction works in the Republic of Bulgaria and minimum warranty periods for completed construction and installation works, facilities and construction sites, and they begin to run from the date of issuance of a Permit for use of the construction. The implementation of the following mandatory measures is envisaged: Thermal insulation of external walls; Thermal insulation of the roof; Thermal insulation of the floor; Replacement of window frames of facade walls with PVC profile with glazing and windows and doors with aluminum profile with broken thermal bridge and glazing; Introduction of energy-saving lighting in common areas of the building. During construction, designers will exercise author's supervision. The total estimated value of the contract shall be: BGN 1 404 800.00 (one million four hundred and four thousand and eight hundred) excluding VAT or respectively BGN 1 685 760.00 (one million six hundred and eighty-five thousand and seven hundred and sixty) including VAT, allocated and formed from the values of the individual activities of the subject of the contract, as follows: Total value for the preparation of an investment project in the ‘working project’ phase and for the execution of author’s supervision of the site during construction: BGN 38 500.00 (thirty-eight thousand five hundred) excluding VAT, calculated from the following estimates: Estimated value for the preparation of an investment project in the ‘working project’ phase: BGN 35 500.00 (thirty-five thousand five hundred) excluding VAT; Estimated value for provision of supervision services during construction: BGN 3 000.00 (three thousand) excluding VAT; Total cost of construction and installation works – BGN 1 366 300.00 (one million three hundred and sixty-six thousand and three hundred) excluding VAT. The contracting authority shall set a maximum time limit for the preparation of an investment project in the ‘working project’ phase, which shall be offered by the participants as follows: 40 (forty) calendar days, starting from the date of signature of the contract. The deadline for implementation of the construction works is at the proposal of the participant and should not be shorter than 240 calendar days and not be longer than 320 calendar days, but not later than 31.01.2027, which starts running from the delivery of the construction site to the contractor with a protocol. 2 according to Ordinance No 3 of 31.07.2003 on the preparation of acts and protocols during construction and ends with the delivery of the construction by the contractor with a statement of findings establishing the suitability for acceptance of the construction (Annex No 15, according to Ordinance No 3/31.07.2001 on the preparation of acts and protocols). Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/495639
https://app.eop.bg/today/495639
45211000 - Construction work for multi-dwelling buildings and individual houses
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.