Published17/04/2025
-
Today16/05/2025
-
Deadline20/05/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
25003_CABLE PLOUGHING_STRENGLÖGN_Berufjörður_Austurland
The project involves laying about 15.4km of high-voltage cables in Berufjörður from Kelduskógar to Melshorn and to Eiríksstaðir in Fossárdalur. Installing six substations and laying low-voltage local loops from them. It is expected that fiber optic pipes will be plowed with high-voltage cables. The project also includes laying a 3x50q high-voltage cable at Karlsstaðir for about 0.67km and installing a substation. And laying a 3x95q high-voltage cable at Urðarteigur for about 2.3km and installing a substation. The project is to begin on June 9 and be completed on August 29, 2025.
https://utbod.rarik.is/aspx/Home
https://utbod.rarik.is/aspx/Home
45231400 - Construction work for electricity power lines
31321000 - Electricity power lines CVP code deduced from the text of the procedure AI-generated
31300000 - Insulated wire and cable CVP code deduced from the text of the procedure AI-generated
31320000 - Power distribution cables CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.