Tender for a Design & Built contract regarding structures and civil works for the Kalvebod Passing Track (Sub-project 1) - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

Tender for a Design & Built contract regarding structures and civil works for the Kalvebod Passing Track (Sub-project 1)

  • Published
    21/05/2025
  • Deadline
    19/06/2025
  • Today
    18/07/2025
Status
Submission closed
Type of contract
Works
Subject for Renewal
No
Buyer
A/S Øresund
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DK011 Byen København
Business sector (Main CPV)
45234100 Railway construction works
Total estimated contract value (excluding VAT)
332,500,000.00 DKK
Total final contract value (excluding VAT)
Not available
Tender reference number
-
Description

On 4 April 2024, Folketinget (the Danish Parliament) passed a Law on the upgrading of the Øresund line, wherein it has been decided to construct two Passing Tracks at Kalvebod. A/S Øresund has been tasked by the Ministry of Transport to implement the project ’Passing Track Kalvebod’. Several preliminary investigations have been carried out so far. The relevant material is available at: https://sundogbaelt.dk/forbindelser/overhalingsspor/. The project comprises the establishment of two new tracks parallel to the two existing tracks. The project also includes a restructuring of the Hammelstrupvej Bridge to accommodate four tracks as opposed to the current two tracks and the replacement of two footbridges across the line. The two new tracks will require the establishment of new traction power comprising gallows masts covering both tracks. The current neutral section must also be moved and pumping station 2 must undergo some reconstruction to accommodate the new tracks. Sheet piling must also be installed along the entire section to keep the earth embankment in place and provide room for the two tracks. The project Passing Track Kalvebod will be established in two sub-projects: Sub-Project 1 ”Structures and Civil Works” and Sub-Project 2 ”Track and Traction Power”. This tender concerns the Sub-Project 1. Sub-Project 1 will be particularly logistically complicated to execute in that the work will be carried out without direct access, in very little space, with difficult soil conditions and water and drainage challenges. Ac-cess for vehicles, cyclists and pedestrians must be ensured continuously throughout the construction period and special attention will need to be paid to neighbours and stakeholders in the area. Sub-Project 1 includes all construction and structural works for the passing tracks and bridges/footbridges (including geotechnical conditions for both slopes and structures, removal and relocation of soil, a new drainage system, bridge expansion and two new footbridges, the establishment of sheet piles, noise barriers, traction power systems, and signalling works (to be coordinated and executed by Banedanmark). As regards Sub-Project 1, A/S Øresund wishes to enter into a Design & Build Contract with one Design & Build Contractor. The Client also wants close collaboration with the Design & Build Contractor as regards the Project’s development, including the choice of subsolutions, options for alternative approaches to construction logistics, including the establishment of sheet piles and footbridges, the management of water and soil conditions and the options for sustainable and climate optimised solutions. It is on this basis that the Design & Build Contract will comprise an initial Collaboration and Project Development phase (hereinafter the CPD phase) and a detailed design and execution phase. The purpose of the CPD phase is to ensure the development of the project in a collaboration between the Design & Build Contractor and the Client, where the Design & Build Contractor, the Client and consultants together develop ideas and find solutions in accordance with the Client’s requirements and target price. See Appendix 5 of the CPD for further information about the CPD phase. On the basis of dialogue, collaboration and project development in Phase 1 (CPD phase cf. Appendix 5), the Design & Build Contractor shall submit a final fixed price for the Design & Build contract. The financial framework within which project development can take place (”Target price”) is DKK 330,000,000. For more details see the Design & Build contract. During the project development phase and following receipt of the Design & Build Contractor’s final offer, the Client may cancel the remainder of the agreement if the Design & Build Contractor’s total offer exceeds the Target Price. In this case, the Design & Build Contractor shall continue to receive remuneration for participation in the project development, see the Design & Build contract.

Submission Method
Electronic via:
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=423253&B=
Tenders may be submitted
Electronic submission: required
https://eu.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=423253&B=
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Award method
Organisation and Key persons
Estimated value
332,500,000.00 DKK
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.