-
Published21/07/2026
-
Today08/08/2026
-
Deadline20/08/2026
-
Opening of tenders20/08/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Lighting modernisation – replacement of discharge luminaires with LED luminaires – Kortowo housing estate in Olsztyn
The subject of the contract is the replacement of discharge luminaires with luminaires in LED technology. Scope of service: 1) Execution of disassembly of 231 pcs, existing discharge luminaires. The dismantling material must be transferred intact to the ZDZiT warehouse. If the Ordering Party finds that the dismantled material is used and is not suitable for re-use, the Contractor is obliged to dispose of it at his own expense. 2) Installation of luminaires in LED technology (according to photometric calculations attached) with connection and necessary programming 231 pcs. 3) Performing as-built photometric measurements for situations presented in photometric calculations to confirm whether the installed material met the requirements and assumptions included in the photometric calculations. 4) SO-103 Measurement of network parameters and in the event of exceeding the limit values in the range of reactive power occurrence, group compensation of the supply point should be made (addition of an additional cabinet with a compensator with an existing SO). 5) SO-142 Measurement of network parameters and in the event of exceeding the limit values in the field of reactive power, group compensation of the supply point should be made (addition of an additional cabinet with a compensator with an existing SO). 6) SO-198 Measurement of network parameters and in the event of exceeding the limit values in the field of reactive power, group compensation of the supply point should be made (addition of an additional cabinet with a compensator with an existing SO). 7) SO-199 Measurement of network parameters and in the event of exceeding the limit values in the field of reactive power, group compensation of the supply point should be made (addition of an additional cabinet with a compensator with an existing SO). 8) Replacement of 36 sets of power cords with overhead line fuse and PEN clamp due to the presence of aluminum wires. The purpose of this procedure is to obtain an order of the quality specified in the FTZ. For these reasons, the Contracting Authority has taken due care that the subject-matter of the contract is not described by indicating trademarks, patents or the origin, source or specific process that could lead to the preference or elimination of certain economic operators or products. If, despite this, it turns out that there are such indications in any place of the FTZ and in the annexes thereto, they should not be considered as requirements relating to the subject-matter of the contract, but should be considered only in terms of indications of an informative nature (not binding on the Contractors). A detailed description of the subject of the contract is included in Annex 4 to the FTZ.
https://zamowienia.olsztyn.eu/
https://zamowienia.olsztyn.eu/
Type: price
Description: Kryterium „cena” rozpatrywane będzie na podstawie ceny ofertowej (z VAT) za wykonanie całości zamówienia, podanej przez Wykonawcę w formularzu OFERTA. Wykonawca, który przedstawi w ofercie najniższą cenę za wykonanie całości zamówienia otrzyma maksymalnie 80 pkt. Pozostali Wykonawcy otrzymają proporcjonalnie mniej punktów.
Weight (percentage, exact): 80
Criterion:
Type: quality
Description: Kryterium „Dodatkowa gwarancja powyżej wymaganych 60 miesięcy” rozpatrywane będzie na podstawie informacji podanej przez Wykonawcę w formularzu OFERTA. Punkty przyznawane będą według następujących zasad: 60 miesięcy - 20 pkt 48 miesięcy - 15 pkt 36 miesięcy - 10 pkt 24 miesiące - 5 pkt 12 miesięcy - 0 pkt W przypadku braku na formularzu ofertowym informacji dotyczącej dodatkowej gwarancji, zamawiający do porównania ofert przyjmie termin minimalny – 12 miesięcy.
Weight (percentage, exact): 20
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.