-
Published10/06/2025
-
Today12/07/2025
-
Deadline18/07/2025
-
Opening of tenders18/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Electrical maintenance and modernization works from incidents, in low and medium voltage distribution networks and in transformer stations belonging to S.C. Delgaz Grid S.A. - 16 lots. Text automatically translated in your browsing language Automatically translated
Electrical works of maintenance and modernization from incidents, in low and medium voltage distribution networks and in transformer stations belonging to S.C. Delgaz Grid S.A., the procedure divided into 16 lots. The object of the acquisition consists in the execution of the works, including the supply by the economic operators of the materials necessary for the execution of the works. In accordance with Article 21 of Law No 99/2016, the total estimated value of the purchase, for all lots, is RON 537 649 257.84 excluding VAT, consisting of: - value of the works subject to acquisition = RON 286 163 843.28 excluding VAT, - value of the materials made available by the contractor = RON 24 644 846.40 excluding VAT - value of the materials made available by the contractor/DELGAZ GRID = RON 217 804 568.16 and RON 9 036 000.00 excluding VAT, representing the value of the flat rate Note 1: The tender will be drawn up on the basis of the maximum estimated quantities of the CA in accordance with the Annexes made available by the contracting entity, namely Annexes 1.1, 1.2, 1.3 and 1.4. It is estimated the conclusion of at least 1 subsequent contract / year, without reopening the competition. The contracting entity wishes to conclude a Framework Agreement with one signatory on each lot. 1. The flat rate was calculated taking into account the entire period of validity of the Framework Agreement. In order to ensure the availability of the personnel, equipment and other means involved belonging to the contractor, to ensure the interventions requested by the beneficiary, available 24 hours a day, 7 days a week, a quota will be provided in the form of a monthly flat-rate payment. Its value is set in RON/year/lot, fixed throughout the duration of the contract and is granted independently of the value and number of interventions executed. The flat-rate payment shall also cover the possible costs incurred by the contractor as a result of changes to the activities scheduled for the performance of urgent activities. If the provisions regarding the time from communication to the intervention itself, the volume of staff required or the allocation of the necessary equipment are not met, once during a calendar month, the monthly flat-rate payment will be reduced by 30%. Failure to comply with these provisions twice during a calendar month shall result in a 60% reduction in the flat-rate payment for that month. Failure to comply more than twice with the above-mentioned provisions leads to the suspension of the flat-rate payment for the current month and allows the unilateral termination of the CA, at the initiative of the beneficiary. The flat-rate payment will be made on the 28th of each month, for the previous month. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45315500 - Medium-voltage installation work
45315600 - Low-voltage installation work
31681410 - Electrical materials
50000000 - Repair and maintenance services CVP code deduced from the text of the procedure AI-generated
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.