-
Published12/06/2025
-
Deadline26/06/2025
-
Today13/07/2025
Utilities
- indicates text translated automatically in your browsing language
Klinikum am Europakanal - Modernisation of the heating centre - Services of property planning Buildings and interiors in accordance with §§ 33 et seq. HOAI LPH 5 Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The Bezirkskliniken Mittelfranken are planning the restructuring of the clinic area as part of the ‘General expansion planning at the Klinikum am Europakanal’ in Erlangen. In this context, the existing heating centre will also be modernised. As the contracted architectural firm leaves the project due to insolvency, it became necessary to re-tendere the services listed below. In 2003, a central wood chip heating plant for the hospital was built on the premises of the district hospitals by a third party. After 20 years of use, the building became the property of the district clinics in 2023 and will be used to restructure the energy supply of the new clinic. As part of the design planning, a CHP plant with the corresponding burner units was designed as part of the new energy centre in accordance with the energy concept. For the required burner room with operational equipment and technical rooms, the western part of the existing wood chip storage hall is separated with a reinforced concrete wall, under the existing roof a ‘house in the house’ is planned. The set room consists of core-insulated sandwich panels and meets the minimum building physics and technical requirements (minimum temperature 10°C, insulation to avoid condensate). The northern façade is additionally clad with trapezoidal sheet metal, similar to the existing façade. In the interior of the building, the new AHUs and gas fireworks are organised on two levels, with steel platforms for installation and steel frames for line distortions. The existing wood chip boiler is being renovated, the adaptations to the boiler house are of minor scope. Furthermore, a new wood chip boiler is installed plus a heat pump is integrated. Buildings and interiors according to §§ 33 et seq. HOAI LPH 5 The milestones for the implementation of the project provide for: - Start LP 5: immediately after commissioning The total cost of the project (KG 200-600) is estimated at approximately € 8.1 million gross, and is divided into the following division of the KG: Calculation of costs Gross RP cost 04.2025 KG 200: approx. 183.260 € KG 300: ca.1.312.113 € KG 400: approx. €5,772,556 This call for tenders is intended to cover the following services: Services of property planning Buildings and interiors in accordance with §§ 33 et seq. HOAI • LPH 5 Text automatically translated in your browsing language Automatically translated
https://plattform.aumass.de/Veroeffentlichung/av259f46-eu
https://plattform.aumass.de/Veroeffentlichung/av259f46-eu
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.