-
Published25/11/2024
-
Today03/12/2024
-
Deadline16/12/2024
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Creation of the new evacuator of the floods of the dam of Oredon Text automatically translated in your browsing language Automatically translated
Construction of a new underground flood evacuator and associated civil engineering: 1. Implementation studies: Carry out the surveys, measurements and evaluations necessary for a proper understanding of the problems to be solved on the site Analyze the plans and technical documents existing on the work Draw up all the implementation studies for all the works requiring it: calculation notes, layout and detail plans, drafting operating procedures and risk analysis of operations 2. Site installations, means of access and handling necessary for carrying out the work 3. Securing the site 4. Creation of new underground and aerial structures 5. Waste management, site cleaning. 6. General coordination of the site Candidates must send an e-mail to: camille.lignieres@shem.engie.com a letter of confirmation of application with the DC1 and the DC2 Legal documents The qualification document that I will send you on request. 3 last balance sheets and profit and loss accounts. The number of candidates will be limited on the basis of the skills and references submitted to the application file, demonstrating the ability to deal with similar subjects, supplemented by a pre-qualification phase. Minimum number envisaged: 3 - Maximum number: 10. Pre-qualification of mandatory suppliers (Submission of qualification form on request): - References for similar work carried out by companies - References for execution studies carried out by prospective execution design offices - Bureau d'études méthodes interne à l'entreprise - Qualifications of companies Qualibat, FNTP, OPIQIBI or similar national qualifications - Quality criteria - HSE criteria - CSR criteria Verification of technical and financial capacity (criteria for the admissibility of applications). Restriction of the number of candidates according to skills and references demonstrating the ability to deal with technically similar subjects. Text automatically translated in your browsing language Automatically translated
https://s1-eu.ariba.com/
https://s1-eu.ariba.com/
45246000 - River regulation and flood control works
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.