Published14/04/2025
-
Today18/04/2025
-
Deadline23/04/2025
Utilities
- indicates text translated automatically in your browsing language
Reconstruction of WN/SN/SN Tarnowo Podgórne station Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
Detailed description of the subject of the contract: 1. Construction and commissioning of a WN/SN/SN transformer station with accompanying infrastructure. 2. Dismantling of the old control room building with leftover devices, cable ducts and other unused devices and structures along with obtaining the required permits and documents necessary for demolition. 3. Dismantling of the old MV switchgear building with the leftover equipment, cable ducts and other unused equipment and structures along with obtaining the required permits and documents necessary for demolition. 4. Dismantling of WN switchgear. 5. Transfer of materials from dismantling for disposal/use confirmed by the Waste Transfer Card. 6. Construction of a new MV switchgear building in accordance with the Standards in the distribution network of ENEI Operator. 7. Delivery of all equipment and materials necessary to carry out the task, with the exception of WN/SN transformers and electricity meters. 8. Delivery of two 15/6 kV transformers with 6.3 MVA. 9. Construction of a new access road to the station, internal roads and parking lot. 10. Water supply and drainage of sanitary and rainwater shall be ensured in accordance with the guidelines defined as ‘Standard in the distribution network of Enea Operator Sp. z o.o. 11. Construction of a de-oiling system. 12. Commissioning by the Contractor in agreement with the Ordering Party of data transmission from electricity metering systems to the OrigAMI system. 13. Calculating and agreeing with ENEA Operator Sp. z o.o. security settings - all devices in the station being built, excluding the 110 kV line and rail connector for which the security settings will be provided by the Ordering Party. It is the Contractor's responsibility to introduce and launch them at the facility. 14. Obtaining a decision on the use of the subject of the contract for the benefit of the Ordering Party. 15. Measurement of noise and electromagnetic radiation. The contractor will carry out measurements of electromagnetic fields in the environment and submit them in electronic form within 30 days from the date of measurements to the Provincial Environmental Protection Inspectorate and the Provincial Veterinary Inspectorate. Copies will be provided to the Ordering Party and BO, in accordance with the provision: The operator and user of a device emitting magnetic fields (power stations or overhead power lines with a rated voltage of not less than 110 kV or radiocommunication, radio navigation or radiolocation installations emitting electromagnetic fields with an equivalent isotropic radiation power of not less than 15 W, emitting electromagnetic fields with frequencies from 30 kHz to 300 GHz) are required to measure the levels of electromagnetic fields in the environment (Article 122a of the Environmental Law): immediately before the installation or appliance is put into service; whenever there is a change in the operating conditions of an installation or appliance, including a change due to changes in the equipment of the installation or appliance, in so far as such changes may affect the level of electromagnetic fields generated by the installation or appliance; c) each time in the event of a change in the existing state of development and development of real estate resulting in changes in the occurrence of places available to the public in the vicinity of the installation or device - at the written request of the owner or manager of the real estate on which this change took place. 16. Notification of the newly created infrastructure as an object generating an electromagnetic field. The Contractor will notify the installation to the Provincial Inspectorate for Environmental Protection within the required deadlines, and will send copies of the notification to the Contracting Authority and the BO. 30 days before putting into operation an installation from which the emission does not require a permit, and which may have a negative impact on the environment (stations and power lines with a voltage of not less than 110 kV), it must be reported to the competent regional inspector of environmental protection (Article 76. Mouth 4 of the Environmental Protection Act). The start of operation of a newly built or substantially modified installation may be commenced if the Provincial Inspectorate for Environmental Protection does not raise an objection by means of a decision within 30 days of notification of the notification (Article 152 EPL). 17. Training of employees of ENEA Operator Sp. z o.o. in the operation and operation of GPZ Tarnowo Podgórne. Text automatically translated in your browsing language Automatically translated
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-84197f6f-79fd-42e2-b3eb-12b922464194
https://ezamowienia.gov.pl/mp-client/search/list/ocds-148610-84197f6f-79fd-42e2-b3eb-12b922464194
45317200 - Electrical installation work of transformers
45210000 - Building construction work
45342000 - Erection of fencing
45232150 - Works related to water-distribution pipelines
71300000 - Engineering services
45311000 - Electrical wiring and fitting work
45312310 - Lightning-protection works
45315400 - High voltage installation work
45112710 - Landscaping work for green areas
45112730 - Landscaping work for roads and motorways
31321000 - Electricity power lines
31321220 - Medium-voltage cable
31321100 - Overhead power lines
48100000 - Industry specific software package
31321200 - Low- and medium-voltage cable
71315300 - Building surveying services
45232200 - Ancillary works for electricity power lines
45316100 - Installation of outdoor illumination equipment
45400000 - Building completion work
71330000 - Miscellaneous engineering services
45312100 - Fire-alarm system installation work
90000000 - Sewage, refuse, cleaning and environmental services
71332000 - Geotechnical engineering services
45310000 - Electrical installation work
71320000 - Engineering design services
42961100 - Access control system
45223300 - Parking lot construction work
80531100 - Industrial training services
31320000 - Power distribution cables
45300000 - Building installation work
24951220 - Fire-extinguisher agents
45315600 - Low-voltage installation work
Type: price
Description: Cena: waga - 100%
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.