-
Published19/07/2024
-
Deadline19/08/2024
-
Opening of tenders20/08/2024
-
Awarded29/10/2024
-
Today30/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
‘Preparation of a report on the investment compliance of a technical design and exercise of construction supervision of a site: "Engineering – design, execution of construction and exercise of author's supervision of the site: "Rehabilitation of the municipal road PVN 1047 from road III - 118 - Gorna Mitropolia - Staroseltsi, section from km 5+225 to km 7+310" Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The following main activities are included in the scope of the contract: Activity 1. Conformity assessment of the prepared investment project in the "technical design" phase for a site: “Engineering – design, execution of construction and supervision of the site: “Rehabilitation of the municipal road PVN 1047 from road III – 118 – Gorna Mitropolia – Staroseltsi, section from km 5+225 to km 7+310” with the essential requirements for construction works. The conformity assessment carried out will serve to issue a building permit – after all the necessary documents have been submitted by the contracting authority. Activity 2. Construction supervision during the implementation of the site, until its adoption and putting into operation, in accordance with the requirements of the Spatial Planning Act and ensuring the application of the Bulgarian regulatory requirements; Activity 3. Performing the function of Safety and Health Coordinator in accordance with Regulation No 2 of 22 March 2004 on the minimum requirements for health and safety at work in the performance of construction and installation works; Activity 4. Preparation of a technical passport in accordance with Article 176a of the Spatial Development Act and Regulation No 5 of 28 December 2006 on the construction or the relevant part of the site if parts of the entire construction contract are handed over in stages. The subject matter of the contract is the ‘provision of services’ within the meaning of Article 3(1)(3) of the Public Procurement Act, and the contractor selected for the public procurement contract must carry out consultancy services within the meaning of Article 166(1) of the Spatial Planning Act (ZUT), monitoring compliance with the requirements of Article 169(1) and (3) and Article 169b(1) of the ZUT when performing the subject matter of the contract. Full information on the scope, volume and performance requirements of the procurement is detailed and regulated in the Technical Specifications annexed to the procurement documents. Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/409418
https://app.eop.bg/today/409418
71520000 - Construction supervision services
71521000 - Construction-site supervision services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.