Denmark-Helsingør: Construction works for power plants and heating plants
Helsingør Kraftheater A/S wishes to renew the existing CHP plant by building a new biomass fired CHP plant located in the immediate vicinity of the existing CHP plant on the energy road. The works are tendered out in lots. The present contract covers the closure of roofs, façade and external complete parts of the laboratory building, Flis grube, Soldhus and storage silos 1 and 2.
Closure – roof/façade:
Laboratory building:
Laboratory building is carried out as a regular building hull, of approximately 200 m², with a height of approximately 5 m;
The building envelope is carried out as a light structure mounted on a steel structure.
The Facade build-up includes insulated backwall cassettes, mineral wool, wind/water barriers and an external coating of corrugated and varnished Au plate.
The cake build-up includes corrugated roofs, vapour barriers, mineral wool, roof membrane.
Chips grabs:
Cover the crup with a slight shield on the roof and facades, the ground area of approximately 190 m² and a height of approximately 10 m;
The façade and roof structure includes an uninsulated cladding of corrugated aluminium sheets on a steel structure.
Soldhus
The Sold House is inscribed on a light screen, basic area of approximately 100 m² and height of approximately 15 m;
The screen includes a light coating of, for example, stretched metal on a steel structure.
Storage silos 1 and 2:
The two storage silos each contain 6 000 m³ of fuel. Swivel shall be carried out as in-situ cast cylinders, finishing at the top with a ring bar on which the steel superstructure with an area of approximately 550 m² is resting. A circular taghus connects fuel carriers and storage silo.
The cake superstructure and coating are divided into fields corresponding to the underlying self-supporting roof cassette elements and enclosed in corrugated aluminium plates.
Complementary parts:
Complete elements are incorporated in the roof superstructure, including explosion disconnections, fire ventilation hatches, replacement air barriers, etc.
Structures:
— Steel structures for roofing storage silos, approx. 75 tonnes
— Steel structures for the superstructure of tiles, approx. 15 tonnes
— Tiles laboratory constructions.
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.