-
Published15/10/2025
-
Deadline17/11/2025
-
Today19/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Technical planning TGA and property planning Buildings
As part of this measure, the University Medical Center Göttingen intends to replace and expand three low-voltage and main switchgear of a total of five systems in the UBFT. This is the 2nd. the construction phase of these measures. The already exchanged low-voltage main distributions S1 and S2 in the UBFT form the reference for this second construction phase. The adjacent medium-voltage switchgear was refurbished a few years ago and is therefore not part of this measure.
https://www.meinauftrag.rib.de
https://www.meinauftrag.rib.de
71000000 - Architectural, construction, engineering and inspection services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.