Leipziger Straße underground station Fire protection - Drywall work Text automatically translated in your browsing language Automatically translated
In the existing underground station Leipziger Straße in Frankfurt am Main, Bockenheim district, a fire protection renovation of the entire station is carried out by the Verkehrsgesellschaft Frankfurt am Main mbH (hereinafter referred to as ‘VGF’). The fire protection and structural measures take place at the following levels of the station: A-level – above ground, development of underground station Leipziger Straße B-level – distribution level C-level – platform level D-level – platform level Services to be performed The underlying list of services includes the drywall works. The services listed in the schedule of services include: - Provision and provision of own construction site equipment - Installation and dismantling of scaffolding via stairs (fixed and escalators) - Protecting escalators and railings and floor coverings - Breaking down of sheet metal ceiling aprons - Manufacture of ceilings from cement building panels - Manufacture of F90 drywall shaft walls - Preparation of works and assembly plans including testable statics The working height is up to approx. The documentation must be handed over to the VGF before the start and after the completion of the construction project. For the work in the station of the VGF, ID cards for all persons of the AN on site must be applied for from the VGF. The name and a passport picture of all employees involved in the construction are required. A VGF-specific instruction is given when the card is handed over. For the measure, the WG commissions a safety and health coordinator to supervise the construction activity. This is accompanied by project-specific instruction to which at least one employee of the AG must participate. Immediately before the construction project, the contractor will arrange the following works on the construction site as a prerequisite for the work: - Power distributors in technical rooms of the underground levels (by third party company) Simultaneously ongoing construction works During the execution, other companies will be active on the construction site at the same time. Coordination with contractors working in parallel on the construction site is required. The start of work depends on the completion of the respective area by the preliminary works There are confidential documents/plans in this procedure. These are essential for submitting a tender. The confidential documents will be made available to the tenderer after the submission of the signed confidentiality declaration via the tenderer communication of the "Deutsche eVergabe". Text automatically translated in your browsing language Automatically translated
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/527eeee1-a434-4d6d-abe5-c7fe7e092851
https://bieterzugang.deutsche-evergabe.de/evergabe.bieter/api/supplier/external/deeplink/subproject/527eeee1-a434-4d6d-abe5-c7fe7e092851
45200000 - Works for complete or part construction and civil engineering work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.