Production of a pipeline in Bietigheim - Planning services

  • Published
    21/09/2026
  • Today
    12/10/2026
  • Deadline
    19/10/2026
Status
Published
Type of contract
Services
Subject for Renewal
No
Buyer
Gemeindeverwaltung Bietigheim
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DE124 Rastatt
Business sector (Main CPV)
71300000 Engineering services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

The municipality of Bietigheim intends to enable prospective commercial development on an area of around 62.5 ha south of the B3 between the existing industrial site Lidl/former Bundeswehrgerätelager and the area towards Neumalsch. A major reason for the planned infrastructure measure is the planned settlement of Amazon on a sub-area of about 20 ha. For the development of the commercial development area, a new technical infrastructure for secure supply and disposal is required. The municipality therefore intends to produce a waste water discharge including a pumping station, a redundant drinking water pipeline and additional empty pipes. The basic routing was examined and developed as part of a preliminary investigation that had already been carried out. The route is shown in the attached plan. The engineering services to be contracted include the processing of the performance phases 1-9 in accordance with HOAI, including the necessary coordination, approvals, tendering and awarding, as well as construction supervision and property support. The timing of the implementation of the measure is largely dependent on the planned settlement of Amazon. As far as possible, the infrastructure should be completed with sufficient time buffer before the planned connection or commissioning of the site, currently expected in the middle/end of 2029. The current rough cost estimate (as of June 2026) assumes the following construction costs: - sewage pipe, pumping station incl. TA: approx. 1.533.000 € net - drinking water pipe: approx. 1.692.000 € net - ducts: approx. 286.000 € net

Submission Method
Electronic via:
https://www.subreport.de/E53367896
Tenders may be submitted
Electronic submission: required
https://www.subreport.de/E53367896
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
Award method
Beim Bietergespräch gewonnene Eindrücke
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.