Publications Office of the EU
Execution of complete project documentation together with obtaining all administrative decisions necessary to carry out construction works carried out in the Dębica Forest District as part of the project entitled Comprehensive project on adaptation of forests and forestry to climate change – small retention and combating water erosion in lowland areas – continuation (MRN3) (III repeated procedure) - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Execution of complete project documentation together with obtaining all administrative decisions necessary to carry out construction works carried out in the Dębica Forest District as part of the project entitled Comprehensive project on adaptation of forests and forestry to climate change – small retention and combating water erosion in lowland areas – continuation (MRN3) (III repeated procedure)

  • Published
    26/09/2025
  • Deadline
    31/10/2025
  • Opening of tenders
    31/10/2025
  • Awarded
    19/11/2025
  • Today
    18/05/2026
Status
Awarded
Type of contract
Services
Subject for Renewal
No
Buyer
Skarb Państwa Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Dębica
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: PL824 Tarnobrzeski
Business sector (Main CPV)
71322000 Engineering design services for the construction of civil engineering works
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
237,390.00
Please consult each lot for details
Number of lots
3
Tender reference number
Not available
Description

1.1. The subject of the contract is the execution of complete design documentation (hereinafter referred to as documentation) together with obtaining opinions, administrative arrangements and decisions required by construction law and performing author's supervision for the following tasks: 1.1.1. Task name: Part 1: Execution of project documentation for the task: Expansion of the existing water reservoir in Oddz. 60j Machowa Forestry; Description: - Extension of the dyke with the incorporation of protection against damage caused by beavers, construction of the island, deepening of the reservoir to a depth of 3 m and extension of the water reservoir in order to increase the retention capacity to 40 000 m3 of water, - construction of a water abstraction point for firefighting purposes with a manoeuvring area for fire brigade cars. 1.1.2. Task name: Part 2: Execution of project documentation for the task: Expansion of the existing water reservoir in Oddz. 221h Forestry of the Void; Description: - Extension of the dyke with the incorporation of protection against damage caused by beavers, construction of the island, dredging to a depth of 3.5 m and extension of the water reservoir to increase the retention capacity to 10 000 m3 of water, - construction of a water draw-off point for firefighting purposes with a manoeuvring area for fire brigade cars. 1.1.3. Task name: Part 3: Execution of project documentation for the task: Construction of a dry tank in sec. 28a Wolica Forestry; Description: - Construction of a dry reservoir by partitioning the watercourse with an earth shaft, with the installation of a pipe that lets water through freely and strengthening the inlet and outlet with a stone mark-up. The planned volume of water retention is 400 m3 in the area of approx. 0.3 ha. 1.2. The documentation will include: 1.2.1. Design documentation containing: 1.2.1.1. construction project to the extent that it takes into account the specificity of construction works. 1.2.1.2. Executive design 1.2.2. A financial statement containing: 1.2.2.1. Investor's estimate, 1.2.2.2. Measurement of works, 1.2.3. Technical Specification for the Execution and Acceptance of Works (STWiOR), 1.2.4. The documentation shall be provided in triplicate in paper form. In addition, the Contractor will provide electronic documentation in .pdf, .dwg format for the drawing part (containing at least drawings of the situational plan in the PUWG 1992 coordinate system) and .docx and .xlsx (for the descriptive part) on an electronic medium.

Submission Method
Electronic via:
https://platformazakupowa.pl/pn/lasy_debica
Tenders may be submitted
Electronic submission: required
https://platformazakupowa.pl/pn/lasy_debica
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
31/10/2025 10:15
Place of performance
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.