Published27/03/2025
-
Today21/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
"IMPLEMENTATION OF PROJECT ENGINEERING: RECONSTRUCTION OF THE INTERNAL WATER NETWORK OF POLYANOVO S., GENERAL. HARMANLI’ Text automatically translated in your browsing language Automatically translated
The project treats the reconstruction of the internal water supply network including the replacement of the existing water supply network with high-density polyethylene pipes with an approximate length of 12,000 m, the exact size will be determined after the preparation of the investment projects. The existing water supply network is extremely depreciated, resulting in continuous breakdowns. In a number of sections the existing water pipeline is cracked, partially rotted and through the cracks there are significant losses of drinking water, which affects the price of the end user. With frequent water stops, drainage water penetrates through the cracks in the water pipe, which leads to the risk of infection. In order to improve the water supply of the settlement and reduce water losses in the network, it is planned to replace the old pipes with high-density polyethylene pipes that meet modern hygiene and technical requirements. The project also includes the replacement of the asphalt pavement on the streets where the water supply network will be reconstructed, the replacement of curbs and pavements. The object of the public procurement includes reconstruction of a water supply network, replacement of the water supply pipeline with SPEED pipes, cutting of asphalt, excavation works, transportation and rupture, strengthening, supply and installation of a new water supply pipeline, new building deviations, new shut-off valves, new overhead hydrants, new connections to each existing water supply, supply of suitable material and sand for backfilling, embankment and sealing to a road bed. The reconstruction of the road surface includes the destruction of pavement and road surface, a trench to reach a ready bed, laying unsorted crushed stone, laying asphalt layers, pavement and curbs. In order to achieve the above, it is envisaged that the following will be implemented within the framework of this award: Preparation of an investment project in the "technical design" phase and implementation of author's supervision during construction. The design team of the contractor is obliged to exercise author's supervision during the construction of all parts of the project in accordance with Article 162 of the Spatial Development Act. The designer under the relevant part must be present at the drafting of all acts and protocols requiring the participation of a designer, mandatory according to the category of construction according to the requirements of Regulation No 3 of 2003 on the drafting of acts and protocols during construction. Execution of the planned construction works, according to the prepared design documentation. The warranty periods for the site are in accordance with Regulation No 2 of 2003 on the commissioning of construction sites in the Republic of Bulgaria and minimum warranty periods for completed construction and installation works, facilities and construction sites, and they begin to run from the date of issuance of a Building Permit. The total estimated value of the contract is: BGN 14 700 000.00 (fourteen million and seven hundred thousand) excluding VAT or BGN 17 640 000.00 (seventeen million and six hundred and forty thousand) including VAT, divided and formed by the values of the individual activities of the subject of the contract, as follows: Total value for the preparation of an investment project in the ‘technical design’ phase and for the implementation of author’s supervision of the site during construction – BGN 300 000.00 (three hundred thousand) excluding VAT, based on the following estimates: Estimated value for preparation of an investment project in the technical design phase: BGN 260 000.00 (two hundred and sixty thousand) excluding VAT; Estimated value for provision of supervision services during construction: 40 000.00 (forty thousand) BGN excluding VAT; Total value for the execution of construction and installation works – BGN 14 400 000.00 (fourteen million and four hundred thousand) excluding VAT. IMPORTANT: At the time of the opening of the public procurement procedure, no funding has been secured and pursuant to Article 114 of the Public Procurement Act, the implementation will begin after funding has been provided by the Contracting Authority, for which the Contracting Authority will notify the Contractor in writing. Term of execution of the contract: The contracting authority shall set a maximum time limit for the preparation of an investment project in the ‘technical design’ phase, which shall be tendered by the tenderers as follows: 40 (forty) calendar days, starting from the date of receipt by the selected contractor of an explicit assignment letter for the moment of start of the implementation of the specified activities, taking into account the secured funding, and ending with acceptance of the implementation by the Contracting Authority with a bilaterally signed acceptance-delivery protocol. The contracting authority shall set a maximum time limit for the execution of the works, which shall be tendered by the participants as follows: 360 (three hundred and sixty) calendar days, which begins to run from the handover of the construction site to the contractor with protocol ref. 2 in accordance with Ordinance No 3 of 31 July 2003 on the drawing up of acts and protocols during construction and ends with the delivery of the construction by the contractor with Statement of Findings Form 15. Author's supervision during the execution of construction works on the site is performed from the date of opening of the construction site and ends with the drawing up of a Statement of Findings establishing the suitability for acceptance of the construction (Annex No 15 to Article 7(3)(15) of Regulation No 3 of 31 July 2003 on the drawing up of acts and protocols during construction). Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/451536
https://app.eop.bg/today/451536
45231110 - Pipelaying construction work
45233000 - Construction, foundation and surface works for highways, roads CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.