Primary technical planning and installation as well as secondary technical installation 110-kV substation Leinefelde - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates CPV codes deduced from the text of the procedure

- indicates text translated automatically in your browsing language

Primary technical planning and installation as well as secondary technical installation 110-kV substation Leinefelde Text automatically translated in your browsing language Automatically translated

  • Published
    20/12/2024
  • Today
    21/01/2025
  • Deadline
    28/01/2025
Status
Published
Type of contract
Works
Subject for Renewal
No
Buyer
TEN Thüringer Energienetze GmbH & Co. KG
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEG06 Eichsfeld
Business sector (Main CPV)
45232221 Transformer substation
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
2024_MA7_04_LF_No
Description

The client of the project is TEN Thüringer Energienetze GmbH & Co. KG. This is a regional distribution system operator. This contract deals with a partial lot in the context of the construction of a 110 kV substation with double busbar. It is a 110 kV double busbar system by the AN with: - 6 line control panels - 2 transformer control panels - 2 coupling panels - 2 voltage converter panels - 2 MS earth leakage compensation systems as a compact system - control, protection & control cabinets to be planned primarily and the materials to be provided by the customer to be installed. The existing MS system must be re-integrated from a primary technical point of view. The necessary cables including fittings must also be re-laid. The secondary planning and the complete control, protection and control cabinets as well as the 110 kV devices, MS switchgear are provided. However, these must be set up and connected on all sides. The construction site clearance/provisions must be planned and installed primarily in terms of technology. This includes in particular the connection of two 110 kV MSW (modular derailleurs). Since security of supply must be guaranteed at all times, the construction work is carried out under difficult conditions in two construction phases. Text automatically translated in your browsing language Automatically translated

Submission Method
Electronic via:
https://www.dtvp.de/Satellite/notice/CXP4YR2HTZB
Tenders may be submitted
Electronic submission: required
https://www.dtvp.de/Satellite/notice/CXP4YR2HTZB
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Place of performance
CPV code

45232221 - Transformer substation

31210000 - Electrical apparatus for switching or protecting electrical circuits CVP code deduced from the text of the procedure AI-generated

31200000 - Electricity distribution and control apparatus CVP code deduced from the text of the procedure AI-generated

Award method
Not available
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.