Design and execution AUTOSTRADA TÂRGU NEAMŢ -IAŞI - UNGHENI TRONSON 2 Târgu FRUMOS - Letcani Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The investment objective of the Târgu Neamț – Iași – Ungheni motorway is to create a modern communication route for the junction between section 2 of the Ditrău – Târgu Neamț motorway in the area of Moțca at km 0+000, developing on a corridor from West to East to the bridge over the Prut to Ungheni. The starting point of section 2 Târgu Frumos - Lețcani is km 31+500 (where the connection with section 1 Târgu Neamț (Moțca) – Târgu Frumos is made). Between km 31+500 – km 40+000 the motorway route runs north of DN28 in the area of Razboieni, Valea Oilor and Balțați and intersects DC117 and DC116. At km 40+000, in the area of crossing the Hirtopeanu Mound, given the nature of the land and the risk of slippages, a tunnel was proposed to be executed using the cut&cover method, in order to limit the amplitude of the works and ensure the continuity of a local agricultural road. Between km 40+000 – km 47+000, the motorway route crosses DC115. The motorway continues north of Podu Iloaiei, and at km 50+100, a simple trumpet road junction connecting the motorway with DN28 to the west of Podu Iloaiei. After the locality Podul Iloaiei, the motorway route bypasses a dam, intersects DJ281 and DJ282D, and between km 53+500 – 54+340, the gas network Gherăieşti-Iaşi (Fir I, II); Gherăieşti-Leţcani DN 700 (designed pipe). In order to make a connection of the motorway with Iasi, a road junction was proposed at the north-western part of Lețcani, which facilitates access to the western part of Iasi, making the connection with the national road DN28 and the Bypass VO28D, by means of a connecting road. The length of lot 2 of motorway is 28.60 km, the length of the road connecting with DN 28 (4-lane road) is 7.677 km and the length of the road connecting with DN 28D (2-lane road) is 5.23 km. The number of days until which clarifications can be requested before the deadline for submission of tenders is 25 days. The contracting authority will respond to clarifications on the 12th day before the deadline for submission of tenders. The contracting authority will respond ONLY to the requests for clarifications addressed by the economic operators by the established deadline. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45233100 - Construction work for highways, roads
45221111 - Road bridge construction work
45233126 - Grade-separated junction construction work
45233128 - Roundabout construction work
71322500 - Engineering-design services for traffic installations
45221240 - Construction work for tunnels
71350000 - Engineering-related scientific and technical services CVP code deduced from the text of the procedure AI-generated
71500000 - Construction-related services CVP code deduced from the text of the procedure AI-generated
71520000 - Construction supervision services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.