General renovation Rupert Egenberger School Höchberg; Natural stone work BA I Text automatically translated in your browsing language Automatically translated
The conversion and refurbishment measures take place during ongoing school operation. In the construction phase, some classrooms and administration are outsourced to containers. The course of construction work during ongoing operation must be taken into account and coordinated. The building is also to be renovated energetically and to enable barrier-free usability. Fire protection and the escape route situation must also be overplanned and adapted to the latest regulations. The school building consists of several components, the different levels of which are connected in the existing building by several access corridors and stairs. The access / main entrance is via the Rudolf-Harbig Platz by means of a staircase and a ramp path. There is currently no classroom accessible for disabled people. The terrain rises from south to north. While the component is oriented on the mountain side in the north, the component is reached in the south via side entrances, the administration is located in the middle area of the building and can be reached via the main entrance and the side entrance. The buildings are partly basement and have been built in 1- to 3-storey construction. The aim of the planning is to accommodate the classrooms as summarized as possible. The specialist rooms are somewhat separate. In the future, the administrative wing with school management will be located closer to the main entrance. An extension of the former administrative wing and the addition of an elevator will not only make the school clearer in the future, but also make it barrier-free. The outdoor area at the main entrance is raised to create a barrier-free entrance. The existing school façade consists of reinforced concrete columns/pillars and brick infills. The building has several expansion joints in the exterior facade. The metal substructure is connected to the lightning protection system on site. All reinforced concrete supports have broken edges. The following quantities are indicated: 70m2, refurbish existing natural stone floor approx. 270m2, natural stone setting steps supplement approx. 82 pieces, minor demolition work and additions to the existing natural stone floor. Text automatically translated in your browsing language Automatically translated
https://www.staatsanzeiger-eservices.de/
https://www.staatsanzeiger-eservices.de/
45214000 - Construction work for buildings relating to education and research CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.