-
Published21/11/2024
-
Today07/12/2024
-
Deadline23/12/2024
Utilities
- indicates text translated automatically in your browsing language
City of Hamburg, district office Mitte, sports and exercise room in the park at the flood basin Text automatically translated in your browsing language Automatically translated
The "Park am Hochwasserbassin" is located in the Hammerbrook district of Hamburg and extends over a length of about 1 km along the local flood basin from the Berliner Bogen at Anckelmannsplatz to the Alte Recyclinghof at the Bullerdeich with direct reference to the water system of the Bille. It is part of the overarching Alster-Bille-Elbe green train, which extends from the Alster via the Berliner Tor and the flood basin to the Entenwerder Park. This green corridor is intended to create a continuous green connection that connects several districts and better connects the residents. The sub-sections of the overall green cover are in different planning phases. The implementation part in the flood basin is currently the highest priority. The aim is to provide the planning services for five structures (two floating walkways, two viewing platforms - called Juliet and Romeo bridges - and a balcony with stairs) taking into account the valid directives and the ZTV Ing. These are to be integrated into the higher-level free space concept and coordinated with the free space planner. Requirements from the federally funded model project Mitte machen Sport- und Bewegungsraum in the park at the flood basin must be taken into account. In addition, preparatory structural studies must be carried out on two retaining walls, a wooden sheet pile wall and a bunker; two objects are continued by the free space planner. In addition, a life cycle calculation must be drawn up for the five new structures to be planned, from which the future maintenance costs must be derived. In particular, requirements from monument protection, nature conservation and the specifications of the project promoter must be taken into account in the course of the explanations. The design planning must be closely coordinated with the office atelier le balto, which emerged as the winner of the open space planning competition and takes over the open space planning design. Planning and implementation are also carried out in close coordination with the LSBG (State Operation for Roads, Bridges and Waters), the HPA (Hamburg Port Authority AöR) and the Hamburg-Mitte District Office. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4YND5DGC
https://www.dtvp.de/Satellite/notice/CXP4YND5DGC
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.