-
Published06/05/2025
-
Deadline06/06/2025
-
Opening of tenders06/06/2025
-
Today18/06/2025
Utilities
- indicates text translated automatically in your browsing language
City of Buchloe - extension of a lunchtime care facility to the existing primary school "Meinrad Spieß" in Buchloe -- technical planning technical equipment ELT according to §53 HOAI Lph 1 - 9 Text automatically translated in your browsing language Automatically translated
City of Buchloe - extension of a lunchtime care facility to the existing primary school "Meinrad Spieß" in Buchloe -- technical planning technical equipment ELT according to §53 HOAI Lph 1 - 9 -- The aim of the project is to expand the existing MeinradSpieß primary school (Prof. Neher Straße 1, 86807 Buchloe) by a functional, modern and barrier-free extension, which is specially designed for the care and catering of 140 children. The extension should provide the necessary infrastructure to create a cafeteria, five group rooms, an output kitchen and other necessary ancillary rooms for care and at the same time ensure a harmonious connection to the existing school building. The contracted planner is expected to examine several approaches and discuss them intensively with the building contractor Stadt Buchloe and the school management. -- As part of the project, an extension will be planned, which will include the following spaces: Canteen for 140 children, dispensary kitchen, 5 group rooms, toilets, teacher's rooms and adjoining rooms. -- The extension is connected to the existing school building via a bridge. This bridge allows a barrier-free transition between the old and the new part of the school and ensures that children and caregivers have easy access to the new rooms at all times. The bridge is planned in such a way that it fits architecturally to the existing building, while at the same time being functional and aesthetically pleasing. -- With regard to the existing outdoor facilities, care is taken to ensure that the extension is integrated into the existing space. The hard court will be relocated in order to meet the requirements of the new use and at the same time create sufficient outdoor areas for the children. Detailed planning and coordination with the school and local authorities are necessary to make the adaptations to the outdoor area as environmentally friendly and sustainable as possible. A development plan is already in place. -- The cultivation is planned taking into account sustainable construction, using modern techniques for energy efficiency and resource conservation. In addition, attention is paid to a harmonious integration into the existing architecture and environment of the school, in order to ensure a positive atmosphere for the children and the pedagogical staff. -- All rooms and paths as well as the outdoor facilities are designed for wheelchairs. There is already a lift in the existing building, so there is no need to provide for one in the existing building. -- The stock is supplied by local heat. Cultivation is to be connected to them. -- The subject of the contract is the services technical planning technical equipment ELT in accordance with § 53 HOAI paragraph 2, No. 4 and No. 5 HOAI, planning services from the areas of high-voltage power plants and telecommunications and information technology plants within the meaning of § 53 HOAI paragraph 2, No. 4 and No. 5 HOAI, planning services from the areas of high-voltage power plants and telecommunications and information technology plants within the meaning of § 53 HOAI paragraph 2, No. 4 and No. 5 HOAI, planning services from the areas of high-voltage power plants and telecommunications and information technology plants within the meaning of § 53 HOAI paragraph 2, No. List of objects Technical equipment Annex 15.2 HOAI AG 4 and 5. -- The commissioning is carried out in stages in accordance with § 55 HOAI. In the case of a contract, the first stage is phase 1, phases 1 and 2. The client decides on a further commissioning of the service levels in the further course of the procedure. No claims for the transfer of further service levels or other services can be derived from the step-by-step commissioning. Construction costs (KG 300 - 400) are estimated at approximately EUR 4.3 million gross. -- The planning is scheduled to start shortly after the order has been placed, probably in June 2025. Completion is planned in the 3rd quarter of 2027, commissioning in the 4th quarter of 2027. -- The special services are designed as options which the client can call up, but which he is not obliged to call up. -- The contract will be based on the model contract Certiform/Boorberg. Text automatically translated in your browsing language Automatically translated
https://plattform.aumass.de/Veroeffentlichung/av25497a-eu
https://plattform.aumass.de/Veroeffentlichung/av25497a-eu
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.