Planning services for the planned construction of 110 kV cable routes between the Wöhler and Maarweg substations

  • Published
    11/08/2025
  • Deadline
    18/09/2025
  • Today
    10/05/2026
Status
Submission closed
Type of contract
Services
Subject for Renewal
No
Buyer
RheinEnergie AG -L-
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DEA23 Köln, Kreisfreie Stadt
Business sector (Main CPV)
71323100 Electrical power systems design services
Total estimated contract value (excluding VAT)
Not available
Total final contract value (excluding VAT)
Not available
Tender reference number
Not available
Description

RheinNetz GmbH is planning new cable routes of the 110 kV voltage level to secure the supply of the Cologne city area on the left bank of the Rhine. In order to ensure the power supply in the 110 kV range, the substation (hereinafter referred to as UW) Wöhler and UW Maarweg are to be connected via a so-called transport route. Connection points are defined in the range of both UWs (Appendix 5.2 and 5.3). The transport route comprises a redundant cable connection, i.e. the laying of 2 cable systems, each with a cable system in an approximately 0.6 m wide lean concrete block (Appendix 5.4). In order to comply with the redundant supply, the two cable systems must be located in separate streets, but at least on opposite sections of a common road in the case of a borderline. The route search amounts to a length of approx. 2 x 4.5 km. 4.5 km is the simple distance of an existing route link between the two substations. The cable laying is mainly made in open trench construction. Only at neuralgic points (e.g. railway tracks, crossings, water bodies, bridges, etc.) is the production carried out in underground construction. The services owed or the scope of services (performance diagrams, service phases, basic and special services) result from the general planner contract.

Submission Method
Electronic via:
https://www.subreport.de/E26716148
Tenders may be submitted
Electronic submission: required
https://www.subreport.de/E26716148
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
Not available
Estimated value
Not available
Final contracted value
Not available
Award of contract
Not available
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.