-
Published06/06/2025
-
Today09/07/2025
-
Deadline18/07/2025
-
Opening of tenders18/07/2025
Utilities
- indicates text translated automatically in your browsing language
Conversion of overhead contact line systems of SWB Text automatically translated in your browsing language Automatically translated
In the construction area of the BAB 565 below the bridge "Tausendfüßler" are the two light rail lines of lines 16 and 18, each with two tracks, on a special railway body and at different altitudes. The chainwork of the existing overhead contact line system consists of a CuSn AC120 contact wire and two Cu150mm2 load-bearing cables. Track changes are covered with a CuSn AC120 contact wire and a Cu150mm2 support cable. Preparing for the demolition and new construction of the bridge structure of the BAB 565, this system is replaced in the area of the bridge structure of the BAB 565 by a fixed overhead contact line - a ceiling track system (DSS). The deliverables were published for the first time in 2024 under MA No A-07716-20_44-24-0001. Text automatically translated in your browsing language Automatically translated
https://vergabe.autobahn.de
https://vergabe.autobahn.de
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.