-
Published19/03/2025
-
Today21/04/2025
-
Deadline29/04/2025
-
Opening of tenders30/04/2025
Utilities
- indicates text translated automatically in your browsing language
‘Selection of a contractor for the preparation of a comprehensive report on the assessment of compliance with the basic requirements for construction works and technical control under part “Construction” and the exercise of construction supervision during the construction of the site: “Implementation of permanent, restoration and fortification works on Republican road III-597 “Ivaylovgrad – Lyubimets” at km 28+700” Text automatically translated in your browsing language Automatically translated
The purpose of the public procurement procedure is for the Road Infrastructure Agency to appoint a contractor to provide consultancy services (construction supervision) in connection with the design and construction (engineering) of the specific site by drawing up a comprehensive report assessing the compliance of the investment project with the basic requirements for construction works and technical control under the ‘Construction’ part and exercising construction supervision during the construction of the site. In this connection, a contract for its implementation was concluded with a view to carrying out quality construction of the site in accordance with the regulatory requirements and meeting the agreed deadlines. With each torrential rain, the technical and operational condition of the site deteriorates. There is a longitudinal joint formed along the asphalt pavement on the side of the fallen embankment. There is a high probability of failure of the roadway, detachment from the road and occurrence of road accidents. To date, the embankment has fallen to a length of 20 m. In more severe weather conditions, such as heavy rains, storms and snow, there is a risk of landslides and road destruction, which can lead to road accidents with human casualties. The road section is located outside the settlement, entirely in mountainous terrain. The design speed is 70 km/h. Situationally, the section is straight. The section is in an embankment, with the activation of destabilisation processes, as a result of which in some places the banquet has collapsed and continues to collapse, as well as a part of the asphalt pavement, which is about 70 cm slightly cut off. Running surface water destroys the integrity of the road and the banquet. Surface water is drained to the banquet, breaking the embankment of the road. All this is a prerequisite for the removal of part of the earth's sail. There is a risk of collapse of the asphalt pavement and collapse of the road on the right side. The total length of the compromised section is about 250 meters. - from km 28+600 to km 28+850 The road in the section has two lanes with the following gauge: - lanes: 2 x 3.50 m; - width of the banquet: 2 x 1.00 m., missing in places; - total gauge: 7.00/9.00 m. Construction of the existing pavement: - a wearing layer of dense asphalt concrete – 4 cm; - non-dense asphalt concrete – 4 cm; - crushed stone pavement – 15 cm. - base of ballast-35 cm On the track there is a road restraint system on the left and right. The section is marked with balises and a speed reduction of 40 km/h. There is no temporary traffic organisation in place. No concentration of road accidents has been identified in this scope. The republican road is the only road connection of Ivaylovgrad municipality to Lyubimets municipality and Haskovo municipality, and vice versa. The road is busy, passing both light and heavy vehicles and buses. Every day on the national road there are buses transporting students from neighboring villages to the nearest school. Project documentation: A design assignment has been prepared for the site. The purpose of the assignment is the development of a Technical Project on the basis of which fortification and preventive measures and activities on the national road network will be carried out with a view to ensuring conditions for traffic safety and comfort of the passengers. A design assignment will be submitted to the designated contractor for the execution of the public procurement. The subject-matter of the contract shall include a description of the activities to be carried out under the contract, as follows: A) Stage I - Preparation of a comprehensive report for assessment of the compliance with the basic requirements for construction works and technical control under part "Structural" of the design development; B) Stage II - Exercising construction supervision during construction, in accordance with the requirements of the Spatial Planning Act (SPA) and the secondary legislation; C) Stage III - Exercising construction supervision during the removal of manifested defects during the warranty periods under Ordinance No 2 of 31.07.2003 for commissioning of construction sites in the Republic of Bulgaria and minimum warranty periods for completed construction and installation works, facilities and construction sites. * IMPORTANT! A detailed description of the activities covered by the contract is set out in the Technical Specifications for the Implementation of the Consultancy Service (Annex B), an integral part of the procurement documents! Text automatically translated in your browsing language Automatically translated
https://app.eop.bg/today/467280
https://app.eop.bg/today/467280
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.