Published12/06/2025
-
Today12/07/2025
-
Deadline15/07/2025
-
Opening of tenders17/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Drafting projects and studies of geotechnical risk reduction or consolidation and stabilization of slopes and embankments on various roads. The object of this contract is to obtain the technical documents necessary for the improvement of the current conditions of various roads. Text automatically translated in your browsing language Automatically translated
The object of the contract is the provision of services for the drafting of the following construction projects and studies: Lot 1: Project for the consolidation and stabilization of slopes and embankments on the TF-13 road, from Tejina to Punta del Hidalgo, between PPKK 16+200 and 16+950, T.M. San Cristóbal de La Laguna. Lot 2: Project to reduce geotechnical risks and consolidate and stabilize slopes on the TF-21 road, from La Orotava to Boca Tauce, between PPKK 38+00 and 43+000 in Las Cañadas, T.M. La Orotava. Lot 3: Project to reduce geotechnical risks and consolidate and stabilize slopes on the TF-21 road from La Orotava to Boca Tauce, between PPKK 47+000 and 49+000 in Las Cañadas, T.M. La Orotava. Lot 4: Project of geotechnical study, study of alternatives and project for the elimination of risks and stabilization in the Insular Highway TF-13, in the section known as Vía de Ronda, located between the P.K. 1+500 and the P.K. 3+700, T.M. San Cristóbal de La Laguna. Lot 5: Geotechnical study and study of alternatives to the problems of consolidation and stabilisation in ‘La Vetita’, on the TF-82 road, from Santiago del Teide to Armeñime, between PK 28+500 to 30+500, T.M. Santiago del Teide. Lot 6: Project of consolidation and stabilization of slopes and embankments on the road on the road TF-134, from El Bailadero to Benijo, from the PK 5+500 to the end, T.M. Santa Cruz de Tenerife. Lot 7: Project of elimination of risks, stabilization and consolidation of slopes in the Insular Highway TF-629, from the TF-1 to Villa de Arico, among the PP.KK. 1+700 and 6+000, T.MU. of the Villa de Arico. Lot 8: Project for the reduction of geotechnical risks and the consolidation and stabilization of slopes on the TF-28 island road, from Taco to Los Cristianos, in La Cisnera between PPKK 60+350 and 61+130, T.M. of the Villa de Arico. Text automatically translated in your browsing language Automatically translated
https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=100D6rRDXkysNfRW6APEDw%3D%3D
https://contrataciondelestado.es/wps/poc?uri=deeplink:detalle_licitacion&idEvl=100D6rRDXkysNfRW6APEDw%3D%3D
71310000 - Consultative engineering and construction services
71332000 - Geotechnical engineering services CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.