-
Awarded18/09/2026
-
Today12/10/2026
Utilities
- indicates text translated automatically in your browsing language
Technical planning Technical equipment according to HOAI 2021 - Electrical engineering, telecommunications, building automation systems
In the course of the accommodation of the state authorities, the buildings of Mecklenburgstraße 4-6 are to be fundamentally renovated on the basis of the DZ. In addition to the furnishing as an office building (special construction), house, fire protection and safety requirements are also implemented. With the planning order dated 02.01.20, there is a space requirement of 3,019 m ² (NUF1-6) for the interim accommodation of the State Chancellery. The total construction costs are set at 49.3 million (M4-6 and 8). Both buildings (M4 -6) have a GFA of 13,621 m². Above-average planning requirements can be assumed. The planning services include: Property planning TA Buildings for buildings M 4-6. Specific performance obligations in accordance with the attached procurement documents. The planning scope initially includes the performance level 4bis5 (LPH 8-9 HOAI). The confirmed EW construction of 04/2023 has to be implemented. The LS 2-3 (LPH 5- 7 HOAI) can be operated if required. The result of the LS 2-3 is provided for further use.
Type: quality
Description: Gemäß Matrix 2: Auftragsbezogenes Projektteam 30 % Auftragsbezogenes Konzept zum Ablauf der Planungs- und Baudurchführungsphase 40 %
Weight (percentage, exact):
Criterion:
Type: cost
Description: Gemäß Matrix 2: Honorar Gewichtung 30%
Weight (percentage, exact):
Postal address:
Town: Berlin
Postal code: 10719
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.