-
Published26/05/2025
-
Today18/06/2025
-
Deadline23/06/2025
Utilities
- indicates text translated automatically in your browsing language
Engineering services according to Part 4 Section 2 HOAI (ELT) Text automatically translated in your browsing language Automatically translated
Federally owned apartments Ulm, Säntisstraße 26,28 + Werastraße 3,7,4,6,8,10, DG extension, balcony extension, engineering services according to Part 4 Section 2 HOAI (ELT). The intention is to commission specialist planning services for technical equipment in accordance with Section 2 of Part 4 of the HOAI, for plant groups 4 (power plants) and 5 (telecommunications and information technology plants). Performance phases to be awarded according to HOAI: 5 to 8. The renovation measure comprises a total of 8 Gründerzeit houses (built in 1890). These each have three residential floors with two mirror-image 2-room apartments as well as a basement and an attic. All roof trusses are removed and newly erected as a mansard whale roof. The new living space to be created in the attic floors (two mirror-image 2.5-room apartments per house) is approx. 57 m2 per apartment (total approx. 912 m2). The existing apartments have a total living area of approximately 2,670 m2. The overall measure is divided into 4 construction phases, each with 2 residential buildings to be renovated; BA 1 (Werastraße 8 + 10) is already in the final phase of execution and not part of this order. For reasons of age, the current specialist planner Elektro will leave after completion of the 1. BA out. The planning for BA 2 will be handed over completely. An orderly handover takes place. The electrical work for the 2. BA are already awarded (same company as BA 1). The task includes the following measures in BA 2-4: - Dismantling of the existing electrical installation - Installation of external and internal lightning protection / surge protection - own HV counters, HV General, UV apartments - Equipment apartments in equipment variant HEA Standard - Installation of a balcony socket - Installation of door intercom systems in combination with letter boxes - Preparatory installations for fiber optic connection in the apartments - Outdoor lighting for house entrance, garbage and bicycle sheds - possibly preparatory installations e.g. connection 1 charging station with 2 outlets (11 KW) for 2 parking spaces respectively 1 charging station (11 KW) for a parking space - Installations for PV roof systems The existing fire protection concept and the existing interface catalogue must be taken into account or applied. Text automatically translated in your browsing language Automatically translated
https://vergabe.landbw.de/
https://vergabe.landbw.de/
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.