-
Published10/07/2025
-
Today19/07/2025
-
Deadline23/07/2025
-
Opening of tenders23/07/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Preparation of project and environmental documentation for the parallel left track of the Divača - Koper railway line Text automatically translated in your browsing language Automatically translated
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The subject of the public contract is the preparation of project and environmental documentation for the parallel left track of the Divača-Koper railway line in stages: PHASE A - obtaining a building permit in an integrated procedure and the implementation of PZI in a BIM environment (A0: Carrying out geological-geomechanical and hydrogeological research; A1: Preparation of project documentation, including all previously necessary documents/bases/plans and elaborations that are necessary for the preparation of the EIA, for the successful preparation of the document and the implementation of the assessment procedure, and for obtaining opinions and building permits (DGD); A2: Elaboration of a project environmental impact report (EIA) with the addition to protected areas to the full extent required, including cross-border assessment; A3: Creation of PZI project documentation in the BIM environment for the construction of the parallel left track of the Divača-Koper railway line; A4: Examination, updating and harmonisation of the technical specifications for construction, which were the subject of documentation on the right-hand track of the Divača-Koper railway line, with a view to possible optimisation, due to changes in legislation and alignment with the project for the implementation of the left-hand track; A5: Preparation of all the necessary phases of project documentation for obtaining a building permit and for the implementation of plumbing infrastructure in the parallel left track; Participation in the procedure for obtaining an integrated building permit is taken into account in items A1-A3 and A5) and PHASE B – execution of works (B1: design supervision throughout the construction period; B2: Supplements to the BIM model of PZI project documentation at the time of construction (3D, 4D, 5D), B3: Creation of a BIM model of the PID phase with related status documents (3D, 4D, 5D and 6D), B4: elaboration of a single protection and relief plan). A detailed description of the subject of the public contract can be found in the Project Task. Text automatically translated in your browsing language Automatically translated
https://ejn.gov.si/ponudba/pages/aktualno/aktualno_jnc_podrobno.xhtml?zadevaId=58689
https://ejn.gov.si/ponudba/pages/aktualno/aktualno_jnc_podrobno.xhtml?zadevaId=58689
71000000 - Architectural, construction, engineering and inspection services
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.