-
Published27/06/2025
-
Today14/07/2025
-
Deadline25/08/2025
-
Opening of tenders25/08/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Execution of works for the investment objective: "Binding road between A1 and DN7 (DJ 711 A) - LESSON OF 4 CIRCULATORY BENEFITS" Text automatically translated in your browsing language Automatically translated
The construction works of the connecting road A1 and DN7 will consist of: • construction of a 4-lane road system; • ensuring optimal rainwater run-off; • Establishing road signs. The works to extend to four lanes the connecting road A1 and DN7 (on the overlap area with DJ 711A) will consist of: • Upgrading the road system and widening it to 4 lanes; • ensuring optimal rainwater run-off; • Re-establishment of road signs. • Support/consolidation works for embankments The projected route has a total length of 14+003 km. Also, 5 bridges/passages will be built/rehabilitated, namely: POD KM 1+832 over the Arges River In accordance with the provisions of the Technical Expertise, in order for the existing bridge at km 1+832,50 (km 1+759,96) to be able to ensure the circulation of vehicles on 4 lanes and to ensure normal operating parameters, the following solution of intervention on the bridge is adopted: Rehabilitation of the existing bridge for 2 lanes and construction of a new bridge for 2 lanes, located downstream of the existing bridge and adjacent to it. POD - KM 07+585 over Sabar River The designed bridge has a single opening of 27.00 m and a total length of 37.00 m. In cross-section the bridge has a width of 20.30m, of which the roadway of 16.80m and two sidewalks of 1.75m each. POD over Şuța River KM 10+143 The designed bridge has a single opening of 27.00 m and a total length of 36.00 m. In cross-section the bridge has a width of 20.30m, of which the roadway of 16.80m and two sidewalks of 1.75m each. POD over channel KM 12+300 The designed bridge has a single opening of 27.00 m and the total length of 35.00 m. In cross-section the bridge has a width of 20.30m, of which the roadway of 16.80m and two sidewalks of 1.75m each. PASAJ ON DJ 711A OVER A1 TO KM 49+400 Intervention solution - Passage on DJ 711A over A1 to km 49+400 Existing Passage - Infrastructure consolidation and superstructure replacement: Execution of a new passage with 2 lanes, joantiv compared to the existing passage 1. The deadline by which any interested economic operator has the right to request clarifications or additional information in relation to the tender documentation shall be no more than 20 days before the closing date for the submission of tenders. 2.The contracting authority shall respond in a clear and complete manner to all requests for clarification/additional information on the 12th day before the deadline set for the submission of tenders. Text automatically translated in your browsing language Automatically translated
https://www.e-licitatie.ro
https://www.e-licitatie.ro
45221110 - Bridge construction work
71300000 - Engineering services CVP code deduced from the text of the procedure AI-generated
71322000 - Engineering design services for the construction of civil engineering works CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.