-
Published19/06/2025
-
Today12/07/2025
-
Deadline22/07/2025
Utilities
- indicates text translated automatically in your browsing language
Technological park of the town of Šumperk with the participation of MIKROGRID Text automatically translated in your browsing language Automatically translated
The Šumperk Technology Park project, involving microgrids as part of the city's broader energy strategy, includes elements of a technology park with microgrid consumption management. The subject of the contract is a complex implementation of the project Technology Park of the town of Šumperk with the involvement of microgrids and includes: Renovation of the roof of Šumavská 1916/15, 787 01 Šumperk as part of the preparation for the installation of a PV plant Construction of utilities and modernization of wiring for connecting the buildings of Šumavská 2325/21 and Šumavská 1916/15, 787 01 Šumperk, including wiring for public lighting (VO) with switchboards and car chargers Construction of a PV plant on three buildings: Šumavská 2325/21, 787 01 Šumperk MŠ Šumavská 1916/15, 787 01 Šumperk ZŠ Slunce 2692/38, 787 01 Šumperk Construction of a new sampling point and microgrid with main switchboard and large-capacity battery storage (BESS) Integration and commissioning of energy management including control software, measuring and control elements within the interconnection of all elements of the microgrid Partial performance of the contract is not allowed. Implementation must not jeopardise the operation of school facilities. All planned restrictions on the operation of electricity must be coordinated with the Contracting Authority and planned with regard to the operation of the kindergarten and school, ideally during holidays or other operational breaks. The project is primarily intended for implementation with the support of the subsidy programme New Renewable Sources in Energy (RES+) ModF – RES+ No 4/2024 – ModF-RES3-FV_4 entitled ‘PVE of the town of Šumperk’, but its implementation is not dependent on the subsidy. The expected and at the same time installed power of the power plants is a minimum of 196,2 kWp in total, the battery storage capacity is a minimum of 668,92 kWh in total with a tolerance of 5%. The contract also includes the provision of regular service and maintenance during the sustainability period of the project in accordance with the terms of the subsidy programme, which is 5 years from the submission of the documents on the completion of the project for the final evaluation of the action (hereinafter referred to as the “AVA”). The implementation also includes ensuring the connection of the finished work, including the commissioning and subsequent installation of energy management in the form of hardware, including control software and measuring and control elements to optimize the production and consumption of energy at the installation sites, according to the parameters listed in Annex 06_Work Contract, which is part of the documentation. The components used must comply with the subsidy programme and have certificates to be certified by accredited certification bodies (accredited body according to ŠCN EN ISO/IEC17065:2013 or recognised by IECEE, see the list at www.iecee.org/dyn/www/f?p=106:41:0.). Certificates will be handed over after the completion of the work. The subject of performance is further defined by the document component in Annex 04_Elementary documents for implementation such as project documentation, contract with the distributor and other relevant documents. The subject of performance of the contract will be realized completely within the scope of valid technical documentation and in accordance with the conditions within the scope of concluded contracts, which are part of the ZD. The acceptance criterion for the takeover of the work is a one-time determination of the state: all elements of the project are put into full operation, including completed final approval, all required revisions are carried out and the approval of the distribution company is obtained. The takeover is conditioned by a fully functional system including photovoltaic power plants, roof repair, BESS wiring and integration, full functionality of utilities and modernized wiring as interrelated components of the project. Furthermore, all documentation required for the granting of a licence by the Energy Regulatory Office is part of the takeover and energy management at the software level is activated. Part of the takeover is also training of plant operators and all related technological units to operate and maintain the system. Text automatically translated in your browsing language Automatically translated
https://zakazky.sumperk.cz/vz00001482
https://zakazky.sumperk.cz/vz00001482
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.