-
Published06/08/2026
-
Deadline04/09/2026
-
Opening of tenders04/09/2026
-
Today16/09/2026
Utilities
- indicates text translated automatically in your browsing language
Reconstruction of Rhein-Ahr-Stadion in Sinzig - Lot 2
The contracting authority for the tendered construction project is the city of Sinzig. The overall measure includes the reconstruction of the ‘Rhein-Ahr-Stadion’ sports facility on the Green Way in Sinzig as a result of the flood disaster in July 2021. The flood events at that time caused considerable damage to the sports facilities, the technical infrastructure facilities and the adjacent construction facilities. In recent years, the sports areas have been partially temporarily repaired and continued to be used to maintain sports operations. The measure now planned serves the complete and permanent restoration of the sports facility, taking into account the changed framework conditions of flood protection, water development and future requirements for use. For details, see LV.
https://www.subreport.de/E84653643
https://www.subreport.de/E84653643
Type: price
Description: Der Zuschlag erfolgt auf das Angebot zum günstigsten Preis. Maßgeblich ist die durch den Bieter im Leistungsverzeichnis angegebene Gesamtsumme.
Weight (percentage, exact):
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.