V249_2024 Container service contract, component design and delivery Text automatically translated in your browsing language Automatically translated
For the disposal of the irradiated fuel elements of the Berlin Experimental Reactor II (BER II), the Helmholtz-Zentrum Berlin für Materialien und Energie GmbH (HZB) has selected the dry loading of two CASTOR® MTR3 containers in an adapted form, which was developed in 2018. The adjustment consists in placing the CASTOR® MTR3 container for loading not on the deep bed, but instead on the floor of the experimental hall (e-hall). The final lift of the loaded and handled CASTOR® MTR3 container into the floor shock absorbers lying on the low bed is carried out by means of a mobile crane and floor damper plates. After production of the transport configuration and provision of the SEWD protection measures, the loaded CASTOR® MTR3 containers are transported by truck to the transport container warehouse Ahaus in two transport operations. A container supply contract has already been concluded with GNS for the procurement of the two CASTOR® MTR3 containers. The objective of this call for tenders is directly linked to the container supply contract and includes the preparation and participation in the planning of the new disposal variant with a focus on the preparation, handling and handling of the CASTOR® MTR3 containers, the preparation of documents and evidence, the component design and delivery as well as the support of the necessary coordination with the AG and the relevant authorities and experts. For this purpose, the container-specific components required for the preparation, handling and handling of the CASTOR® MTR3 containers are to be designed and the associated component documentation created. If required, the components must be designed in accordance with the relevant KTA regulations, in particular KTA 3902, 3903 and 3905, and are subject to a preliminary examination procedure. The container-specific components essentially comprise all load handling equipment for handling the CASTOR® MTR3 container, the lid system (primary/secondary lids, pressure plate) with accessories as well as components for preparation, loading, handling and transport, taking into account the use of dry loading technology, the transport vehicle and the site-specific requirements of the HZB. These components include: - Floor/lid shock absorbers - Transport rack - Tray traverse - Lid hangers for primary lid, secondary lid and pressure plate - Floor damper plates - Vacuum pump stand for handling - Test equipment/technology for handling - Accessories The shock absorber system consists of a lid and floor shock absorber and is required for transport in the transport configuration in accordance with the traffic approval. The CASTOR® MTR3 container equipped with the shock absorber system is attached to the semi-trailer for transport within a container-specific transport frame. In addition, the container traverse is required for secure and form-fitting attachment to the specific support pins of the CASTOR® MTR3 container. During clearance, the drying of the container interior and the quantification of the residual moisture is an essential step. For this purpose, a container-specific vacuum pump stand, including testing technology, is required to ensure the physical condition of the container interior, which must be complied with in terms of approval. For the connection of this system, the detailed knowledge of the design of the container lid system must be used. For the lifting of the finished CASTOR® MTR3 container by means of a standard mobile crane, special floor damper plates that have already proven themselves in nuclear technology must be designed. The component design and creation of the associated documentation is followed by production or procurement and delivery in the sense of a two-stage process with an intermediate stopping point. The production or procurement and delivery takes place after selection of the previously specified components and approval of the procurement by the client. In this context, the Client reserves the right to release only part of the previously specified components for procurement. The scope of supply and services also includes documentation for training, including the preparation of a cold handling concept, as well as the implementation of training in accordance with the training documents and participation in cold handling in accordance with the cold handling concept. Finally, the implementation or participation in the hot disposal of BE must be offered in accordance with the schedule. The aforementioned services necessarily require detailed knowledge of the design, mechanical and radiological design as well as execution and manufacture as well as the associated safety certificates of the approval-technical approval process of the CASTOR® MTR3 containers. Text automatically translated in your browsing language Automatically translated
https://www.subreport.de/E19944532
https://www.subreport.de/E19944532
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.