-
Published28/02/2025
-
Today16/03/2025
-
Deadline31/03/2025
Utilities
- indicates text translated automatically in your browsing language
Engineering services according to Part 4 Section 2 HOAI Text automatically translated in your browsing language Automatically translated
79110 Freiburg, Georges-Köhler-Allee 203, xxxxx xxxx FR, Uni, Ersatzneubau Laboratory building, Faculty of Environment and Natural Resources (FUNR), Engineering services according to Part 4 Section 2 HOAI, Services of the Technical Building Equipment for the Ersatzneubau Faculty of Environment and Natural Resources (FUNR) at the Technical Faculty of the University of Freiburg. A usable area of around 9,000 m2 is planned for this building. Of this, about 3,500 m2 are allocated to laboratories with S1/S2 classification. The central data center of the University of Freiburg will also be housed in this building. The construction method should preferably be in wood or wood-hybrid construction. Technical building services will be awarded in the following three lots: (1) HLSK, (2) Electrical engineering with conveyor systems and (3) Building automation. Text automatically translated in your browsing language Automatically translated
https://vergabe.landbw.de/
https://vergabe.landbw.de/
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.