-
Published07/03/2025
-
Deadline07/04/2025
-
Today22/04/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Soil acceptance and installation monitoring Bergehalde Maybach Text automatically translated in your browsing language Automatically translated
On the Bergehalde Maybach 2 flattening areas are to be upgraded. Currently, the precipitation water seeps mostly uncontrolled into the heap body and flows over partly unknown paths to the pre-flood. The aim of the remediation is to prevent the infiltration of the rainwater into the stockpile body and the safe discharge to the pre-flood in order to increase the stability of the stockpile body or the stockpile embankments. The refurbishment takes place in accordance with the BBergG (Federal Mining Act). For the profiling of the surfaces, extraneous masses are required, which are made available via the RAG. RAG commissions the contractor with the inspection and release of the soil masses by an expert recognised by the Saarbrücken Mining Authority (soil assessment), with the inspection of delivered soil masses with regard to their compliance with the declaration analysis (material suitability monitoring) and with the acceptance, weighing and recording of incoming lorries. Text automatically translated in your browsing language Automatically translated
http://www.deutsche-evergabe.de/dashboards/dashboard_off/1bb33139-1e46-4e60-894c-7a04055cb0bb
http://www.deutsche-evergabe.de/dashboards/dashboard_off/1bb33139-1e46-4e60-894c-7a04055cb0bb
71330000 - Miscellaneous engineering services
90700000 - Environmental services CVP code deduced from the text of the procedure AI-generated
90000000 - Sewage, refuse, cleaning and environmental services CVP code deduced from the text of the procedure AI-generated
45000000 - Construction work CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.