-
Awarded10/10/2025
-
Today07/11/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Contract WORKS to achieve the public investment objective of the project ‘Modernisation DJ 691 sector Unloading node A1 – Arad county boundary’ SMIS Code 319748 Text automatically translated in your browsing language Automatically translated
The activities related to this documentation will be carried out in accordance with the specifications, the technical documentation posted in SEAP and the legislation in force. The works subject to this procedure will be carried out within 24 months from the date of the administrative order, according to the tender documentation. The main types of works for the realization of the investment provided by the contract are: • the modernisation of the county road with a lane; • intersections with roads and side streets; • making a roundabout at km 17+884; • access to properties; • bus stops; • car parks in and outside the built-up area with minimum facilities; • car shelters; • 2 car weighing platforms for mobile scale; • Existing car weighing platform – retrofitting and fitting; • level crossing at km 18+355 of the county road (km20+385 CF 217 Timişoara Est – Radna) – level crossing arrangement with elastic tiles; • level crossing at km 40+268; the county road (km45+105 CF 217 Timișoara Est – Radna) – level crossing arrangement with elastic tiles and SAT installation; • street lighting and power grids; • realization of rainwater collection and drainage devices; • the construction of tubular and chiseled floors; • repairs to the bridge at km 18+779 and the bridge at km 42+600; • traffic safety features; The estimated value of RON 85 543 196.57 excluding VAT does not include the value of miscellaneous and unforeseen expenses, they will not be subject to the procedure, they do not enter the tender value. Miscellaneous and unforeseen expenses amount to a maximum of 10% of the MC, calculated in accordance with the law (GD 907/2016) and may be accessed/used at any time during the implementation of the contract, in accordance with the provisions of the model contract approved by GD 1/2018, as subsequently amended and supplemented, under the conditions laid down in Article 221 of Law 98/2016. Insofar as the amendments are not substantial, the value of the miscellaneous and unforeseen expenses will be reimbursed only works that may occur during the implementation of the contract, in accordance with the provisions of the model contract approved by Government Decision No 1/2018, as subsequently amended and supplemented (according to Government Decision No 907/2016), on the basis of the unit prices tendered, by applying the provisions of Article 221(1)(a) and (e) and (f) of Law No 98/2016, if applicable. The contracting authority, during the performance of the works contract, if the situation on the ground so requires, may resort to the application of the provisions of Article 221(e) and (f) of Law 98/2016. The contracting authority will respond clearly and completely to all requests for clarification / additional information on the 12th day before the deadline set for the submission of tenders, provided that the requests will be addressed at least 22 days before the deadline set for the submission of tenders. Clarifications submitted after this deadline will no longer be taken into account. Text automatically translated in your browsing language Automatically translated
45233120 - Road construction works
45234000 - Construction work for railways and cable transport systems CVP code deduced from the text of the procedure AI-generated
71000000 - Architectural, construction, engineering and inspection services CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.