Construction of a new day care centre and connection to the existing KiTa as well as the partial renovation of the existing KiTa in Obernzenn - services of property planning buildings and interior spaces, service phases 1-9 in accordance with §§ 33 et seq. HOAI - EU tenders
DisplayCustomHeader
Procurement Detail Actions Portlet
OP Portal - Procurement - Details

This page contains content generated automatically to improve findability and accessibility

- indicates text translated automatically in your browsing language

Construction of a new day care centre and connection to the existing KiTa as well as the partial renovation of the existing KiTa in Obernzenn - services of property planning buildings and interior spaces, service phases 1-9 in accordance with §§ 33 et seq. HOAI

  • Published
    14/02/2025
  • Deadline
    17/03/2025
  • Awarded
    16/07/2025
  • Today
    10/03/2026
Status
Awarded
Type of contract
Services
Subject for Renewal
No
Buyer
Markt Obernzenn
Place of performance
NUTS code: Multiple place of performance
Location of buyer
NUTS code: DE25A Neustadt a. d. Aisch-Bad Windsheim
Business sector (Main CPV)
71200000 Architectural and related services
Total estimated contract value (excluding VAT)
444,000.00 EUR
Total final contract value (excluding VAT)
Not available
Tender reference number
ARCH
Description

The Obernzenn market intends to establish a new day-care centre and to connect to the existing KiTa as well as the subsequent partial refurbishment of the existing KiTa in Obernzenn. In the first construction phase, the new day care center (regular kindergarten and crèche) is to be built as a ground-floor, non-basement building in solid or modular construction (both conceivable in consideration of construction time and costs). The new building must be connected to the existing KiTa (incorporation or connection of the existing and new buildings). After moving into the new building, the partial renovation of the two existing KiTa buildings is required (= 2. construction phase). The buildings of the existing KiTa were built with time intervals and are used differently. For the new construction of the new day care center, the following space requirements were determined: - 3 group rooms for regular groups, - 1 group room for crib children or 1 group room, which can be used for children of the ages 1 to 6 as well as all necessary sleeping, ancillary, staff, sanitary rooms and infrastructures. Due to the size of the future facility, two separate staff areas (including sanitary facilities) are appropriate. The existing KiTa is currently housed in two components: − Component in operation since 1995: Built in monolithic construction, ground-floor building (not basement) with hipped roof for two standard kindergarten groups; In 2016, the sanitary facilities were expanded. Currently there are 3 groups of rules with 20 children each housed in the two group rooms and in the (former) movement room. Gas heating (via radiators). − Component in operation since 2014: Built in wooden frame construction, ground floor extension (not basement) with flat roof for 2 nativity groups with the necessary auxiliary and sanitary rooms. Both crèche groups are currently fully occupied. Gas heating (underfloor heating). In the course of the planning, it is to be determined whether and with what effort the building part from 1995 can be converted to use with two further crèche groups in a substance-conserving manner or whether it makes more sense to accommodate areas for promotion, movement, creativity, learning, personnel, training, storage, technology, etc. in this part of the building after the renovation. The care concept provides for a separate dining room with (issuing) kitchen. This dining room to be built in the new building and a multipurpose room that is as adjacent as possible (‘flexible room models’) should be multifunctional, e.g. also for parental events. In addition, a movement space is required in the new building. Here, too, a multifunctional use / a flexible room model is desired. - The heating or air conditioning should be done by renewable energies, if possible, not only for the new building, but also for the existing building stock (e.g. combination of a PV system with an air-water heat pump). The schedule is as follows: Start of service: 17.06.2025, Construction completion or handover of new building: Autumn 2028, construction completion 2. BA: Autumn of 2029. The scheduling is a preliminary assessment, which may change during the planning process). Total costs currently amount to approximately €6.0 million gross (Kgr. 200-700, DIN 276). This call for tenders is intended to provide the following services (in stages and in stages): Services of property planning buildings and interiors, service phases 1-9 in accordance with §§ 33 et seq. HOAI

Submission Method
Electronic via:
https://plattform.aumass.de/Veroeffentlichung/av247ca0-eu
Tenders may be submitted
Electronic submission: required
https://plattform.aumass.de/Veroeffentlichung/av247ca0-eu
Information about a public contract, a framework agreement or a dynamic purchasing system (DPS)
Not available
Conditions for opening tenders (date)
Not available
Award method
Personelle Besetzung - Gewichtung 40%
Estimated value
444,000.00 EUR
Final contracted value
Not available
Award of contract
Official name: Bietergemeinschaft: Holzinger Eberl Fürhäußer Architekten / Hirsch Architekten
Postal address:
Town: Ansbach
Postal code: 91522
Country:
Prior information
Contract
Award
Footnote - legal notice

This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.