-
Published04/08/2026
-
Deadline01/09/2026
-
Today10/09/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
VgV Freianlagen - Neubau Bauhof Unterer Auenweg Leutkirch i.A.
The urban planning of the large district town of Leutkirch in the Allgäu provides for a relocation of the existing building yard from Brühlstraße to the commercial area on Untere Auenweg south of the sewage treatment plant. A relocation of the construction yard is necessary to make the site free for the construction of a new fire station. . The building yard is part of the public infrastructure of the city of Leutkirch. The aim of the new building is to create a functional, economical and future-proof location that meets the requirements of municipal tasks in the long term. . The city of Leutkirch will carry out the property planning up to and including the permit planning in LPH 4. . The area is bounded in the east by the development road - Unterer Auenweg - and in the west by the Eschach. The course of the terrain is sloping from east to west, so that parts of the area are in the flooding area HQ-Extreme. For economic reasons, the site is not built up via HQ-Extrem. In the case of floods, important access roads to the building yard would also be affected and thus no longer accessible. At present, a height level of 644.50 ü NHN is being sought. A 10m wide protection zone is being developed for the Eschach. . The building plot has no suspected area for the field of soil archaeology. In December 2025, the first drilling for a soil survey took place on the future site. These were evaluated and incorporated into the further planning. The soil assessment will be made available in the second phase. In addition, a species protection report with an impact assessment was prepared, which will be made available in the second phase. . A functionally structured building complex in a wood hybrid construction is planned: - Bases, floor slabs and heavily stressed components in concrete - Wooden stand construction, depending on the use as an insulated building envelope or as an open cold hall - Load-bearing and stiffening exterior and interior walls as large-format, prefabricated wooden elements . The GFA (R) is approx. 6,100m ², GFA (S) approx. 2,200m ² for canopies. . We are looking for a landscape architect for the planning and construction supervision services of the service phases 1-8,+9 on the basis of HOAI 2021, §§ 38-40 for outdoor installations. The assignment should be carried out in stages. In the first stage, the performance phases 1-3 are commissioned. There is no legal claim to the further commissioning of the subsequent performance level. . For further information, please refer to 5.1. of the Notice and the attached summary information.
https://www.subreport.de/E83395216
https://www.subreport.de/E83395216
71420000 - Landscape architectural services
71300000 - Engineering services
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.