-
Published13/10/2025
-
Deadline17/10/2025
-
Awarded21/01/2026
-
Today10/05/2026
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
Technical supervision of the builder and OSH coordinator at the construction site ‘Harmony I - Building modifications of an apartment building, E. Beneš 1747, Hradec Králové’
Note: Not all information for this procedure were successfully computed. Please consult linked documents for more details.
The technical supervision of the builder (hereinafter referred to as ‘TDS’) and the occupational health and safety coordinator (hereinafter referred to as ‘OSH coordinator’) will be carried out on the construction of Harmony I – Construction Modification of a Residential Building, E. Beneš 1747, Hradec Králové. It is an apartment building, which is divided into two parts – part H1 is a sixteen-storey residential part and part H2 is a two-storey entrance building with a dining room. In the H1 part, technical premises, garages and cellars for apartments are located in the 2nd floor. In 1. PP are situated two apartments, commercially used premises and common areas of the house. In 1. NP – 14. NP is located 404 small apartments. In part H2 there is a dining room for dispensing meals in 1.PP. 1. The NP is designed as an entrance to the house. The subject of building modifications of the house is thermal insulation of peripheral structures, including fillings of holes in peripheral structures, thermal insulation and building modifications of the roof and superstructures of machinery spaces of elevators, repair of loggias and building modifications in apartments (new sanitary facilities, replacement of floor coverings, new ascending pipes of sewage and rain sewerage, new water distribution, hot water and sewerage in apartments, new wiring in apartments, modification of the ventilation system of apartments, new kitchen units and built-in cabinets). The work includes the removal of asbestos boards from loggia walls. The scope of the work is evident from the project documentation. Construction works will be carried out gradually in stages during the operation of the building. Tenants will gradually move into finished apartments, thus releasing the original apartments for reconstruction. Ten stages of apartment reconstruction are proposed. Within the individual stages, work on the perimeter structures of the building will take place at the same time.
https://www.tenderarena.cz/profily/hradeckralove
https://www.tenderarena.cz/profily/hradeckralove
71315400 - Building-inspection services
71317200 - Health and safety services
71521000 - Construction-site supervision services
45400000 - Building completion work
45200000 - Works for complete or part construction and civil engineering work
Postal address:
Town: Trutnov - Střední Předměstí
Postal code: 54101
Country:
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.