-
Published11/04/2025
-
Deadline14/05/2025
-
Opening of tenders14/05/2025
-
Today22/05/2025
Utilities
- indicates CPV codes deduced from the text of the procedure
- indicates text translated automatically in your browsing language
GS EDS, House 6 - Heating Text automatically translated in your browsing language Automatically translated
The building is heated and cooled by a 125kW heat pump, which draws its energy from an earth probe field and heat exchangers. Underfloor heating 2,200m2 distributes the heat in the building and allows both heating and cooling. Switching between the operating modes takes place in the technical center. The system consists of three networks: Water/glycol, heating network and refrigeration network separated by heat exchangers. The building is naturally ventilated, with air/water heat exchangers in the stairwells for the conditioning of the supply air and exhaust air. The heat exchangers can perform different functions depending on the season and needs of the heat pump. Text automatically translated in your browsing language Automatically translated
https://www.dtvp.de/Satellite/notice/CXP4Y2Z5F03
https://www.dtvp.de/Satellite/notice/CXP4Y2Z5F03
45331100 - Central-heating installation work
42511000 - Heat-exchange units and machinery for liquefying air or other gases CVP code deduced from the text of the procedure AI-generated
This content published on this page is meant purely as an additional service and has no legal effect. The Union's institutions do not assume any liability for its contents. The official versions of the relevant tendering notices are those published in the Supplement of Official Journal of the European Union and available in TED. Those official texts are directly accessible through the links embedded in this page. For more information please see Public Procurement Explainability and Liability notice.